Similar Projects
Cultural Arts Center
New Construction
Conception
Flower Mound, TX 75028

Peabody Hotel
New Construction, Infrastructure - 345,130 SF
Design
$98,000,000 CJ est. value
Roanoke, TX 76262

Westwood at Rayzor Ranch
New Construction
Design
Denton, TX

Linden Hills Phase 3 - Clearing and Grading
Infrastructure
Post-Bid
Little Elm, TX

Pike Middle School Replacement
New Construction - 250,000 SF
Post-Bid
$94,620,000 est. value
Justin, TX 76247

Annual Requirements Contract for Directional Boring
Term Contract
Results
Arlington, TX

Harvest Phase 11A and 11B Mass Grading
Infrastructure
Results
TX

Village at Lewisville
New Construction - 324,668 SF
Construction
$10,000,000 CJ est. value
Lewisville, TX 75057

Alexan The Point
New Construction
Construction
Flower Mound, TX 75028

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Interior Logic Group / The Offices 3 at Frisco Station
Renovation - 17,681 SF
Pending Verification
$1,150,000 CJ est. value
Frisco, TX 75034

Lakeshore Plaza Mixed-Use Development
New Construction - 51,815 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Little Elm, TX 75068

Admissions Building Foundation Stabilization
Infrastructure
Post-Bid
Denton, TX

Earthwork and SWPPP Improvements for Big Sky Estates Phase 2
Infrastructure
Results
Denton, TX

Aura Old Town Apartments
New Construction
Construction
Lewisville, TX 75057

Last Updated 12/30/2022 09:51 AM
Project Title

Hillwood Company / Union Park Phase II

Physical Address View project details and contacts
City, State (County) Aubrey, TX 76227   (Denton County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Multi-Family Homes, Office, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $70,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 30, 2022, the permit is in review. A general contractor has been selected. Construction could begin first quarter 2023.

Details

3 Stories Above Grade, 433,322 SF. 1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents