Similar Projects
First Avenue - River To Grant - SR11 - City Of Tucson
Infrastructure
Conception
$71,988,200 CJ est. value
Tucson, AZ 85719

Houghton Road - 22nd Street To Irvington - SR1J - City Of Tucson
Infrastructure
Conception
$40,721,000 CJ est. value
Tucson, AZ 85747

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

Valencia - Kolb To Houghton - SR14 - City Of Tucson
Infrastructure
Design
$22,388,700 CJ est. value
Tucson, AZ 85746

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Pine-Strawberry Water Improvement District Deep Well Drilling
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Arivaca, AZ 85601

NolicCovered Wells Intertie Project (Waterline)
Infrastructure
Post-Bid
$1,000,000 to $3,000,000 est. value
Sells, AZ 85634

Tank, Line, And Meter Improvement Project
Infrastructure
Post-Bid
Tucson, AZ

Fire Hydrant, Unidirectional Flushing Services, and Valve Preventative Maintenance
Term Contract, Infrastructure
Results
Tucson, AZ

Tucson - Benson Highway (I-10) (Ajo Way to MP 272)
Infrastructure
Results
$15,495,176 CJ est. value
Tucson, AZ 85706

Mandarina Off-Site Water & Sewer
Infrastructure
Construction
Marana, AZ

Water Distribution System Replacement
Renovation
Construction
$500,000 est. value
Tucson, AZ 85750

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

South Kolb Road Self-Storage
New Construction, Infrastructure - 14,511 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85756

La Paloma Reclaimed Reservoir Rehabilitation - W310 - City of Tucson
Infrastructure
Conception
$2,289,700 CJ est. value
Tucson, AZ 85701

Last Updated 12/08/2022 10:44 PM
Project Title

Sewer System Repair at Agua Caliente Elementary School

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85749   (Pima County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $546,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Tanque Verde Unified School District #13 is in Pima County serving our K-12 Community. This Project will be funded by the Division of School Facilities. This is a project for Sewer System Repairs. Question Submission Deadline:November 8, 2022, 12:00pm Bid Bond: An irrevocable bid security payable to Tanque Verde Unified School District #13 in the amount of 10.00% of the total bid project cost is required. This security should be in the form of a bid bond, certified check, and must be scanned into the Vendor Questionnaire the District by the due time and date cited for this solicitation. The original must be in the Districts possession within 48 hours of the opening of the bids. Performance Bond: The contractor shall be required to furnish an irrevocable security in the amount of 100.00% of the total contract price payable to Tanque Verde Unified School District #13, binding the contractor to provide faithful performance of the contract. This security must be in the possession of the District within 48 hours after receipt of purchase order or other notice of award. The cost of this bond is itemized on the bid submittal form. Performance security shall be in the form of a performance bond, certified check or cashies check. This security must be in the possession of the District within 48 hours after receipt of purchase order or other notice of award. If the contractor fails to execute the security document, as required, the contractor may be found in default and the contract terminated by the District. In case of default, the District reserves all rights to recover as provided by law. All performance bonds must be executed on forms substantially equivalent to the form included with this solicitation. This security must be in the possession of the District within 48 hours after receipt of purchase order or other notice of award. Payment Bond: The Contractor shall be required to furnish non-revocable security for the protection of all persons supplying labor and material to the contractor or any subcontractor for the performance of any work related to the contract. Payment security shall be in the amount of 100.00% of the total contract price and be payable to Tanque Verde Unified School District #13. The cost of this bond is included in your base bid. Payment security shall be in the form of a payment bond, certified check or cashiers check. All payment bonds must be executed on forms substantially equivalent to the payment bond forms on file at the District and incorporated by this reference. This security must be in the possession of the District within 48 hours after receipt of purchase order or other notice of award. Reworking underground sewer lines, regrading the area for stormwater flow and removing and replacing the garden area with new greenhouse, horse fence and moving existing shed and, plants & Planters

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents