Last Updated | 04/14/2023 02:03 AM |
Project Title | Dalton Cardiovascular Research Center Replace Electrical Panels |
Physical Address | View project details and contacts |
City, State (County) | Columbia, MO 65203 (Boone County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $618,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Questions regarding the scope of work should be directed to Monica Santos with Antella at (816) 213-2227 or msantos@antella-inc.com. Questions regarding commercial conditions should be directed to Ashley Karpel at (573) 882-1349 or karpela@missouri.edu. The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on Drawings and specified herein. b. Work shall include everything requisite and necessary to finish work properly, notwithstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. c. General Description of Work: (1) Project consists of replacing existing 208V Federal Pacific panels with new and removing old busduct. (2) Demolition shall consist of removing old busduct made obsolete by new work. (3) Architectural work shall consist of building new furred out electrical risers in the corridors. (4) Structural work shall consist of: N/A 5) Mechanical work shall consist of: N/A. (6) Electrical work shall consist of installing new 208Y/120V panels to replace the existing Federal Pacific panels fed from the busduct and as noted on the drawings. Panels to be located in the corridors to allow for proper working clearances. All branch circuits to be extended to new panel locations and reconnected. Updated panelboard schedules to be provided. New panel feeders to be provided and connected to distribution panels in the basement. Accompanying the bid is a bid bond, or a certified check or a cashier's check payable without condition to "The Curators of the University of Missouri" which is an amount at least equal to five percent (5%) of amount of largest possible total bid herein submitted, including consideration of Alternates. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |