Similar Projects
Leavitt Reservoir Expansion Project
New Construction, Infrastructure
Results
$40,000,000 to $50,000,000 est. value
Greybull, WY

Last Updated 03/29/2022 01:57 PM
Project Title

Z--Snake River Landing Improvements Phase 2, Jackson Lake Dam

Physical Address View project details and contacts
City, State (County) Moose, WY   (Teton County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project site is located 6 miles northwest of the Moran entrance station along the Snake River just below the Jackson Lake Dam. The basic requirements of this construction include the following scope items: Demolition of guard rail and adjacent asphalt. Excavation and Grading Tree Removal Site preparation Landscape preparation (soil ripping and topsoil spreading) and reclamation of user created hiking trails Installation of a poured in place concrete boat ramp Asphalt Paving and striping for vehicular access road and parking areas Installation of decorative concrete paving and concrete curbing Installation of site appurtenances including signage, exhibit footings, fencing, bike racks, picnic tables, and benches Rip Rap and boulder placement Slope Stabilization Assistance to 3rd party masonry contractor to include heavy equipment and operator that will include transportation, placement, and disposal of boulders and palletized stone

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Earthwork Methods, Riprap, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Preparation, Landscape Grading.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Waterway Bank Protection, Riprap Bank Protection, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents