Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

7-Eleven
New Construction
Conception
Biloxi, MS 39531

Shell Gas Station and Convenience Store
New Construction
Design
$5,000,000 est. value
Gulfport, MS 39507

Main Street CSX Railroad Crossing Improvement Project
Infrastructure
Design
$800,000 CJ est. value
Biloxi, MS 39530

Columbaria Burial Expansion and Road Renovation, Biloxi National Cemetery Biloxi
Infrastructure
Bidding
$5,000,000 CJ est. value
Biloxi, MS 39531

Replace Sanitary Lines Live Oak Dining Facility
Infrastructure
Bidding
$250,000 CJ est. value
Biloxi, MS 39534

JTVE 222704 Replace Fence at East Perimeter
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Gulfport, MS 39507

Repair and Maintenance Unit Price Project
Infrastructure
Post-Bid
Gulfport, MS

Olive Garden
Renovation - 6,615 SF
Post-Bid
Gulfport, MS 39503

Gulfport Redevelopment Project at the Gulfport Job Corps Center
New Construction - 635,323 SF
Results
$10,000,000 est. value
Gulfport, MS 39501

Gulf Coast Regional Hopper Dredge Contract. Specification No. OM-21-300
Infrastructure
Results
$13,744,200 CJ est. value
Gulfport, MS 39501

Starbucks Shell
New Construction - 2,172 SF
Construction
$500,000 to $1,000,000 CJ est. value
Biloxi, MS 39531

Buc-ee's Travel Center
New Construction
Pending Verification
Pass Christian, MS

Torch Sports Lounge & Grill
Renovation
Pending Verification
Biloxi, MS 39530

Five Guys
Renovation - 2,500 SF
Conception
Gulfport, MS 39503

Last Updated 08/16/2022 03:13 PM
Project Title

Chipotle / D'Iberville

Physical Address View project details and contacts
City, State (County) Diberville, MS 39540   (Harrison County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Developer
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of a wood-framed national chain restaurant with associated site work. *The owner requests that all subcontractor / supplier inquiries be directed to the Negotiated General Contractor.

Details

1 Story Above Grade, 2,325 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents