Similar Projects
Canal Boulevard Self Storage
New Construction, Infrastructure - 10,440 SF
Design
$1,000,000 CJ est. value
Thibodaux, LA 70301

LA-1: Golden Meadow to Leeville
Infrastructure
Design
$463,000,000 CJ est. value
Golden Meadow, LA 70357

Flotation Canal Mooring Dolphin Repairs
Infrastructure
Bidding
$600,000 CJ est. value
Cut Off, LA 70345

Bayou Region Incubator Facility
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Thibodaux, LA 70301

Golden Meadow Field in Lafourche Parish
Infrastructure
Post-Bid
LA

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Mississippi River Water Re-Introduction into Bayou Lafourche
Infrastructure
Results
Thibodaux, LA

McCloud Housing Site Prep
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
Thibodaux, LA

Metropolitan Transportation Plan
Infrastructure
Pending Verification
$16,000,000 CJ est. value
Thibodaux, LA 70301

John Deere & Company Plant Expansion
Addition, Demolition, Infrastructure
Pending Verification
$29,800,000 CJ est. value
Thibodaux, LA 70301

LA 308: Bartley Ln to Laurel Valley Rd
Infrastructure
Design
$2,500,000 CJ est. value
Raceland, LA 70394

Dredging of Nerby Collins Marina - Site 42
Infrastructure
Bidding
$400,000 CJ est. value
Cut Off, LA 70345

Waterline Relocation at Highway 1 in Conjunction with State
Infrastructure
Post-Bid
Lockport, LA

ADA Restroom Addition - Stopher Gymnasium - Nicholls State University
Addition, Demolition, Infrastructure
Results
$1,219,116 CJ est. value
Thibodaux, LA 70301

LA 653: Bayou Dumar Bridge Replacement
Demolition, New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Raceland, LA 70394

Last Updated 11/10/2022 11:33 AM
Project Title

Port Improvements Northern Expansion, Phase III, Slip C Sweep Dredging Part 2 (Phase IV of SPN H.013648)

Physical Address View project details and contacts
City, State (County) Cut Off, LA 70345   (Lafourche County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dock/Pier/Marine, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,659,878 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements to: Port Improvements Northern Expansion, Phase III, Slip C Sweep Dredging Located in: Lafourche Parish Type of Construction: Dredging Proposal Guaranty: 5% of the Amount of Bid payable to the Greater Lafourche Port Commission Each bid shall include a proposal guaranty in an amount not less than specified above. No proposal will be considered unless it is accompanied by satisfactory evidence that the Bidder holds a Louisiana State Contractor's License in Heavy Construction, in full force and effect and in compliance with the Louisiana State Licensing Board for Contractors and Louisiana Public Bid Law. The contract will be awarded to the lowest responsible bidder without discrimination on grounds of race, color, sex or national origin. Disadvantaged businesses will be afforded full opportunity to submit bids. The award of a contract, if awarded, will be made to the lowest qualified bidder whose proposal complies with all requirements prescribed within 45 calendar days after opening proposals. However, when the contract is to be financed by bonds which are required to be sold after receipts of bids, or when the contract is to be financed in whole or part by federal or other funds not available at the time bids are received, the time will not start until receipt of federal and/or state concurrence or concurrence of the other funding source. Award will be within 30 calendar days after the sale of bonds or receipt of concurrence in award from federal and/or state agency or other funding source. The successful bidder will be notified by letter mailed to the address shown in the proposal that the bidder is awarded the contract. The award of a contract for projects financed either partially or entirely with State bonds will be contingent on approval by the State Bond Commission. On projects involving federal funds the award of contract will also be contingent upon concurrence by the appropriate federal agency. On projects involving state funds the award of contract will also be contingent upon concurrence by the appropriate state agency. The right is reserved to reject bids and waive informalities. In accordance with R.S. 38:2212 (D), deposits on the first set of documents furnished bona fide prime bidders will be fully refunded upon return of the documents, deposits on any additional sets will be refunded less the actual costs of reproduction. ENGINEER: Picciola & Associates, Inc. 115 Picciola Parkway, P.O. Box 687 Cut Off, LA 70345 985-632-5786

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents