Similar Projects
Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Pavement Patching
Results
Rock Falls, IL 61071

HMA Pavement Resurfacing
Results
Morrison, IL 61250

Installation of Oversized Chevrons along Interchange Ramp Curves at Various Locations
Infrastructure
Post-Bid

2021 Village of Erie Sealcoating
Results
Erie, IL

Pavement Patching
Infrastructure
Post-Bid

Hopkins Road District Structure Replacement
Results
Less than $407,229 est. value
IL

Pavement Resurfacing
Term Contract
Post-Bid
$200,000 est. value
Morrison, IL

Removal And Replacement Of Existing Expansion Joints On SN 098-0032 Carrying US 30 Over Elkhorn Creek
Results
IL

Pavement Resurfacing
Infrastructure
Post-Bid
$200,000 est. value
Morrison, IL

Milling and resurfacing on US 30 from Jackson Street to French Creek East of Morrison
Results
Prophetstown, IL 61277

2022 Street Program
Infrastructure
Post-Bid
$310,000 est. value
Sterling, IL

Cold-In-Place Recycling and Resurfacing on Lyndon Road from Us 30 to Commercial Street
Results
Lyndon, IL 61261

2022 GM Route(s) Grove Hill Cemetery
Infrastructure
Post-Bid
$54,000 est. value
Morrison, IL 61270

Last Updated 05/12/2022 11:22 PM
Project Title

Hot-Mix Asphalt Overlay and Associated Work

Physical Address View project details and contacts
City, State (County) Prophetstown, IL   (Whiteside County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Hot-Mix Asphalt overlay and associated work of 1.16 total miles of East 3rd Street within the City of Prophetstown. Estimate of material quantities consist of: 741 Sq. Yds. of HMA Surface Removal (Butt Joints), 280 Sq. Yds. of HMA Surface Removal (Special), 8,185 Sq. Yds. of HMA Surface Removal 1 1/2 ", 9,776 Lbs. of Bituminous Tack Coat, & 1,929 Tons of HMA Mix C, N50, IL-9.5 (Surface).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents