Similar Projects
Sligh Boulevard and Columbia Street Improvements
Infrastructure
Bidding
$9,952,564 est. value
Orlando, FL 32806

Orange Hammock Wildlife Management Area Road Work
Infrastructure
Bidding
$70,000 est. value
FL

Rotary Park: Ball Field Improvements
Renovation, Infrastructure
Sub-Bidding
Hollywood, FL 33021

District 3 Asphalt Paving 2020
Post-Bid
FL

Fort Denaud Road Improvements from SR 80 to Fort Denaud Bridge Way
Post-Bid
Less than $1,200,798 est. value
LaBelle, FL 33935

Roadway Resurfacing-Multiple Site
Results
Less than $2,831,648 est. value
Miami, FL 33128

Construction of Intersection Improvements on Solana Road at SR-A1A
Results
Less than $250,000 est. value
Saint Augustine, FL 32082

Construction Services for Phase 4 Project Improvements
Renovation, Infrastructure
Bidding
FL

Inspection, Management, and Performance of Maintenance on All Components on and along Interstate Highway I-75 in Hillsborough, Pasco, and Hernando Counties
Post-Bid

2020 Microsurfacing
Results
Ormond Beach, FL 32173

Intersection Improvements - SR 35
Infrastructure
Bidding
$802,432 est. value
FL

St. Michael Place Extension Phase 3
Post-Bid
Melbourne, FL 32901

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Resurfacing - SR 10 (US 90)
Infrastructure
Bidding
$5,933,587 est. value
FL

Roadway Improvements to SW 22 Avenue from US-1 to Coral Way
Post-Bid
$559,425 est. value
Miami, FL 33010

Last Updated 10/04/2021 10:42 AM
Project Title

Waterfront Roadway Improvements

Physical Address View project details and contacts
City, State (County) Fernandina Beach, FL 32034   (Nassau County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The following scope of work will consist of but will not be limited to construction for the City of Fernandina Beach Waterfront Roadway Improvements along Front Street. The work will involve shifting Front Street to the west at Ash Street and Centre Street existing railroad crossings to allow room for the new railroad crossing traffic control devices. There will also be a new railroad crossing at Alachua Street also requiring Front Street to shift west.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents