Similar Projects
Last Updated | 07/26/2021 09:26 AM |
Project Title | Fuller Hollow Creek Stream Stabilization Project |
Physical Address | View project details and contacts |
City, State (County) | Vestal, NY 13850 (Broome County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $983,400 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project involves the stabilization and establishment of grade control on Fuller Hollow Creek in the vicinity of Lehigh Avenue and Murray Hill Road in Vestal, NY. Fuller Hollow Creek is highly entrenched and active bank failures are present along both banks. The site is susceptible to significant erosion and incision due to physical and geologic conditions. Impacts from Tropical Storm Irene and Lee included loss and damage of homes and businesses, loss and damage of utility infrastructure, road closures and washouts, and stream bank erosion. This project will establish grade control and stabilize banks which will be achieved through construction of a roughened channel and regrading banks to more stable angles, which will protect private property. The specific objectives of the project include: Reduce erosion and sediment contribution to downstream reaches Establish grade control and slowing rates of incision; Stabilize stream banks; and Protect private property within the project reach |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |