Similar Projects
New Wastewater Treatment Plant
New Construction
Conception
Milton, FL

Construction Management-at-Risk (CMAR) Services for the Greenland Water Reclamation Facility (WRF)
Design
$100,000,000 est. value
Jacksonville, FL 32202

Northwest Wastewater Plant Operations Building
New Construction
Design
$810,000 est. value
Tampa, FL

Design-Build for South County Advanced Wastewater Treatment Facility Expansion
Addition
Bidding
$50,000,000 est. value
FL

South Water Reclamation Facility North Plant Effluent Pump Station Pre-Engineered Building
New Construction
Bidding
$2,111,384 est. value
Orlando, FL 32819

Wastewater Treatment Facility Improvements Phase 1
Post-Bid
Less than $4,900,000 est. value
Davenport, FL

Ocean Outfall Legislaton Program, Construction Package ST-2A, Headworks 3, Oxygenation Trains 9 and 10, and Substaton 57/58
Post-Bid
$89,800,564 est. value
Miami, FL 33170

Construction Manager at Risk Services - Embassy Hills Wastewater Treatment Plant Rehabilitation and Improvements
Results
$585,000 est. value
Port Richey, FL 34668

Construction of Vactor Dump Site WRF#2
Results
Ocala, FL 34471

New Headworks and Grit Removal Facility
Construction
$11,900,000 est. value
Clearwater, FL 33756

CR 136/I-75 Wastewater Treatment Plant
Construction
Less than $1,365,194 est. value
FL

Summerlin Road Force Main Replacement and Fiesta Village Waste Water Treatment Plant Reuse Main Upgrade - Phase 1
New Construction, Infrastructure
Bidding
Fort Myers, FL

Ocean Outfall Legislaton Program, Construction Package St-1B, Oxygenation Trains 1-7 Rehabilitation and Electrical Buildings
Post-Bid
$81,558,147 est. value
Miami, FL 33170

Design-Build GT LOHMEYER WWTP Replacement of Oxygen System Projects 11781 and 11917
Results
Fort Lauderdale, FL 33316

South Martin Regional Wastewater Treatment Plant Filter and Chlorine Contact Basin Improvements
Construction
Hobe Sound, FL 33455

Reported 10/05/2021 12:00 AM
Project Title

Central District Wastewater Treatment Plant 2 Cluster 3 Digester Upgrades

Physical Address View project details and contacts
City, State (County) Key Biscayne, FL 33149   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $31,825,602
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The complete rehabilitation and upgrade to the CDWWTP Plant 2 Digester Cluster 3 facility. The project includes replacement of all existing equipment, valves, piping; and appurtenances; electrical panels, conduits, cables, and lighting; instrumentation and controls; building mechanical; and architectural doors, windows, and louvers within the Digester Control Building and inside Digester Tank Nos. 9, 10, 11, and 12; new digester covers for Digester Tank Nos. 9, 10, 11, and 12; new valve vault for Digester Cluster 3; extension of the existing Electrical Room at the Control Building; structural repairs to and recoating of Control Building and Digester Tank Nos. 9, 10, 11, and 12; furnishing and installing all the equipment necessary for Digester Cluster 1 Tank No. 3 modifications, including one (1) digester gas flare and two (2) gas booster blowers within Digester Cluster 1 Control Building, including all piping, valves, pipe supports, nuts, bolts, and appurtenances for a complete system. This project includes a portion of the work which is contingent upon a separate Miami-Dade WASD`s authorization to proceed with the demolition of the upper floor slab and the construction of a new slab for the upper floor level inside the Digester Cluster 3 Control Building, and repairs/modifications to the existing digester tank corbels.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents