Similar Projects
West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Design
$10,000,000 est. value

West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Design
$10,000,000 est. value

Aluminum Pipe
Infrastructure
Bidding
Lake Charles, LA

Midway Drive Drainage Improvements (Jefferson Hwy. To Charlotte Dr.)
Infrastructure, Alteration
Bidding
Gretna, LA

Luling Pe Office Flood Damage Repairs
Infrastructure
Post-Bid
$50,000 to $100,000 est. value
Luling, LA 70070

Cypress Island/Joe Daigre Drainage System Maintenance Project - Phase I
Infrastructure
Post-Bid
Saint Martinville, LA

Airline at Clearview Intersection Improvements
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
New Orleans, LA 70119

LA 114 - X Drain Replace West of Hessmer
Infrastructure
Results
$250,000 to $500,000 est. value
Hessmer, LA 71341

Drainage Improvements to Coulee Ile Des Cannes - Dulles Drive to Fenetre Road
Infrastructure
Bidding
Lafayette, LA

Biloxi Marsh Living Shoreline Project
Infrastructure
Post-Bid
$50,500,000 est. value
LA

LA 378 - Up Rr Crossing (Westlake)
Infrastructure
Results
$250,000 to $500,000 est. value
Westlake, LA 70669

Barriere Road Drainage Improvements
Infrastructure
Bidding
$667,243 est. value
Belle Chasse, LA 70037

Walter O. Bigby Carriageway Drainage Pump Station
Infrastructure
Post-Bid
$3,900,000 est. value
Bossier City, LA

SB 1811 Farr Park Equestrian Center Phase 1 Arena
New Construction
Results
$740,000 to $800,000 est. value
Baton Rouge, LA 70820

Maintenance of Drainage Systems
Alteration
Bidding
Lafayette, LA

Reported 11/19/2021 12:00 AM
Project Title

Drainage Project - South Magnolia to Cypress

Physical Address View project details and contacts
City, State (County) Baker, LA   (East Baton Rouge County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Prepare pre-construction video to identify the condition of the waterway and private property adjoining the waterway; 2. Identify access points for which Rights of Entry/Hold Harmless agreements may be required and coordinate with City officials to obtain appropriate signatures from property owners; 3. Clear brush and debris within the waterway and transport off-site as specified; 4. Remove any fallen trees lying within the waterway and transport off-site as specified; 5. Cut down any trees growing in the waterway replacing with a material approved by the City's Public Works Department for purposes of maintaining erosion control; 6. Excavate any material blocking the entrance or exit of all outfalls, pipe crossings, etc. which may be spread on-site along existing borders, if possible; 7. Backfill any eroded areas with rip rap, broken concrete or any other stabilized material approved by the City's Public Works Department; and 8. Repair areas of access or existing properties damaged through this process.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents