Similar Projects
Macallister Place
New Construction
Conception
Leawood, KS 66224

Overland Park Arboretum Nature Trail - City of Overland Park
Infrastructure
Conception
$3,050,000 est. value
Bucyrus, KS 66013

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

143-Met
New Construction, Infrastructure - 339,070 SF
Design
$93,000,000 CJ est. value
Overland Park, KS 66223

Shawnee MedAct Station 1131
New Construction, Infrastructure
Post-Bid
$2,068,000 CJ est. value
Shawnee Mission, KS 66217

Shawnee MedAct Station 1131
New Construction, Infrastructure
Post-Bid
$2,068,000 CJ est. value
Shawnee Mission, KS 66217

2021 Cars Webster Street
Alteration
Results
Spring Hill, KS

59th Street Improvement
Infrastructure
Results
Shawnee, KS

Bubble Room Coin Operated Laundry / Shawnee
Renovation, Infrastructure - 4,203 SF
Construction
$160,000 CJ est. value
Shawnee, KS 66203

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Azura Credit Union / Mission
Renovation, Infrastructure - 2,295 SF
Pending Verification
$900,000 CJ est. value
Mission, KS 66202

Pizza Hut / Olathe
New Construction, Infrastructure - 1,880 SF
Pending Verification
$570,000 CJ est. value
Olathe, KS 66062

Fire Station 41 Reconstruction - PB1823 - City Of Overland Park
Demolition, New Construction, Infrastructure
Conception
$13,000,000 CJ est. value
Overland Park, KS 66204

Stoneridge Second Plat - Lenexa
New Construction, Infrastructure
Design
$24,000,000 CJ est. value
Lenexa, KS 66227

On Call Paving Improvements
Infrastructure
Post-Bid
KS

Last Updated 01/11/2023 11:02 AM
Project Title

Archers Landing at Sundance Ridge Third Plat

Physical Address View project details and contacts
City, State (County) Overland Park, KS 66204   (Johnson County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $180,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 484-lot subdivision. This project will be completed in phases, but a full phase breakdown has not been released. As of January 11, 2023, construction of this community is underway, however, an exact timeline for construction has not been confirmed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents