Similar Projects
2929 Broadway Mixed-Use Development
New Construction, Demolition - 222,820 SF
Conception
$10,000,000 CJ est. value
Oakland, CA

Fremont Hall of Justice Systems Upgrade - Alameda County
Renovation
Conception
$639,046 est. value
Fremont, CA 94538

Job Order Contracting
Renovation
Bidding
CA

EHRM Training and Administrative Support Space Construction
New Construction
Bidding
$500,000 to $1,000,000 est. value
Livermore, CA 94550

New Pre-Case Concrete Office Buildings
New Construction, Term Contract - 38,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Livermore, CA

FMD Ronald M George Elevator Modernization
Renovation
Post-Bid
$3,349,000 est. value
Oakland, San Francisco, San Jose, Santa Rosa, CA 94102

General Building (B License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
New Construction, Renovation
Results
$5,000,000 est. value

Enhanced Treatment and Site Upgrade Program - Phase 1A Campus Building Project
New Construction
Results
$78,000,000 est. value
Union City, CA 94587

Studio 2000
New Construction, Demolition - 43,567 SF
Construction
$10,000,000 est. value
Berkeley, CA 94704

939-943 35th St. - West Oakland
New Construction, Demolition
Pending Verification
Oakland, CA 94608

Cesar Chavez Park - New Restroom (On Spinnaker) - PRWT122015 - City of Berkeley
Renovation
Conception
$300,000 est. value
Berkeley, CA 94710

Littlejohn Park Recreation Building Restoration Project
Renovation
Bidding
$500,000 est. value
Alameda, CA 94501

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Fremont Family Resource Center I and II ADA Upgrades
Renovation
Results
$450,000 est. value
Fremont, CA 94537

Corpyard - Green Room Lockers, Bathroom, Training, Room, Floor, Cabinets - Building B - PWT1CB2209 - City of Berkeley
Renovation, Infrastructure
Conception
$1,425,000 est. value
Berkeley, CA

Reported 07/15/2022 10:36 AM
Project Title

African American Holistic Resource Center - PRWT122002 - City of Berkeley

Physical Address View project details and contacts
City, State (County) Berkeley, CA 94704   (Alameda County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $5,666,667
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a municipal facility in Berkeley, California. Conceptual plans call for the construction of a municipal facility. The African American Holistic Resource Center (AAHRC) will be a facility slated to house culturally congruent services to help eliminate inequities within the Berkeley Community. Following the report, A Community Approach for African American/Black Culturally Congruent Services, the City funded a feasibility study and in December 2020, City Council approved Measure T1 funds for the design and construction of the AAHRC. This project is in included in the City of Berkeley FY 2023-2027 Capital Improvement Plan (CIP). As of July 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Misc. Buildings, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents