Similar Projects
Boiler
Bidding
Cedar City, UT

DFCM Construction - Pre Qualified Mechanical - DOH USL MOD 1 Autoclave Replacement
Bidding
$125,000 est. value
Taylorsville, UT 84129

Design-Build Mechanical Upgrade at DISA
Post-Bid
$10,000,000 to $25,000,000 est. value
UT

Aquatic Center Boiler Replacement Project
Post-Bid
Roy, UT 84067

J--NIIP B2.9L Unit 4 Motor Rewind and Reconconditioni
Results
Salt Lake City, UT 84044

Salt Lake City (SLC) Cooling Tower Mechanical Separator
Results
$25,000 to $50,000 est. value
Salt Lake City, UT

Annual Contract for Plumbing/Mechanical Work
Term Contract
Post-Bid
Salt Lake City, UT 84115

Pleasant Grove High School Boiler Replacement
Results
Pleasant Grove, UT 84062

Mckinley Elementary School Boiler Replacement Project
Post-Bid
Tremonton, UT 84337

University of Utah High Temperature Water Converter Building 25
Term Contract
Results
$20,000 to $25,000 est. value
Salt Lake City, UT 84112

Water Chiller Rental Unit - Hill Air Force Base
Term Contract
Post-Bid
Hill AFB, UT 84056

Annual Contract for Boiler Repairs
Term Contract
Results
Salt Lake City, UT 84115

DFCM Construction Pre-Qualification (General, Electrical, Mechanical, Roofing, Paving and Civil)
Post-Bid
Less than $3,500,000 est. value
Salt Lake City, UT 84129

Construction: Westbrook Elementary, Boiler Replacement
Results
Taylorsville, UT 84129

On-Call Task Order General Mechanical Construction Services
Term Contract
Post-Bid
Salt Lake City, UT 84114

Reported 04/03/2021 12:00 AM
Project Title

Sky View High School Pool AHU and Mountain Crest High School Boiler Replacement Project

Physical Address View project details and contacts
City, State (County) Hyrum, Smithfield, UT 84335   (Cache County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of a new steam AHU with additional option for rooftop heat reclaim coils serving the natatorium, along with the associated ductwork, piping, and electrical scope. The removal of the existing steam boilers and steam to water heat exchangers in lieu of gas fired Hi Efficiency condensing hot water boilers. Hot water heaters serving domestic hot water loads shall be included to serve the existing domestic hot water storage system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Steam and Condensate Piping and Pumps, Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents