Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Design
Spokane, WA 99218

Water and Sewer Department General Materials
Infrastructure
Bidding
Pullman, WA

Water Service Meter Improvements - Equipment
Infrastructure
Bidding
Selah, WA 98942

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

NW Lavina Street Water Main Replacement
Infrastructure
Bidding
$620,000 est. value
Vancouver, WA 98687

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

Funk and Ballard Alley Road Water Main Replacement
Infrastructure
Bidding
$705,749 est. value
WA

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Longview and Kinder Reconstruction
Infrastructure
Bidding
$2,750,000 to $2,900,000 est. value
Moses Lake, WA 98837

Last Updated 03/25/2022 02:43 PM
Project Title

Palouse Water Main Replacement

Physical Address View project details and contacts
City, State (County) Palouse, WA   (Whitman County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the project includes installation of approximately 3,360 linear feet of water main, 30 water services and connections, 971 square yards of HMA, 1,574 square yards of gravel surfacing, 1,035 square yards of landscape restoration. Abandonment of existing 4-inch water main, and installation of 5 new fire hydrants and other related miscellaneous items.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents