Similar Projects
Last Updated | 01/17/2022 09:20 AM |
Project Title | Miller Junior High School Site Preparation for Covered Area |
Physical Address | View project details and contacts |
City, State (County) | Aberdeen, WA 98520 (Grays Harbor County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Site Development |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project includes the construction of an elevated concrete slab on grade (50’ Wide X100’ Long x 6-Inch deep) with Adjacent concrete sidewalk (5’ Wide X 169’ Long x 4-Inch deep), 310 Lineal feet of adjacent aluminum hand rail. Storm water generated by this project will be collected by approximately 127 lineal feet of a new 6” diameter SDR 35 PVC perforated pipe, and conveyed via 124 lineal feet of 8” SDR 35 PVC pipe to the newly expanded detention pond. The pond will be enlarged by 46’ X 110’ to accommodate the additional storm runoff. The pond enlargement will also include an additional 258 Lineal feet of in-kind (as existing) chain-link fence and a new outlet riser with overflow handle to be placed in the existing outlet structure. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |