Similar Projects
Concrete Repair and Replacement
Alteration
Post-Bid
Omaha, NE

Ralston High School Baseball / Softball Facility Improvements
Renovation
Post-Bid
$2,213,451 CJ est. value
Ralston, NE 68127

2022 Concrete Diamond Grinding
Alteration
Results
Omaha, NE

Storz Expressway Pumping Station Fuel Tank Improvements - 3rd and Hartman Avenue
Infrastructure
Results
$608,050 CJ est. value
Omaha, NE 68022

Ready Mixed Concrete
Term Contract
Post-Bid
Omaha, NE 68106

2022 Street Reconstruction Castle Creek
Infrastructure
Results
$64,561 CJ est. value
Omaha, NE 68102

Cryer Pool Gutter Repairs
Renovation
Post-Bid
$740,000 CJ est. value
Omaha, NE 68144

13th Street & I-80 Median Reconstruction
Infrastructure
Results
$78,701 CJ est. value
Omaha, NE 68107

Plumbers Local Union 16 Renovation and Addition
Addition, Demolition, Renovation, Infrastructure - 29,238 SF
Post-Bid
$1,000,000 CJ est. value
Omaha, NE 68127

Flanagan Lake Park - Mitigation Tree Plantings
Infrastructure
Results
$52,500 CJ est. value
Omaha, NE 68105

Concrete Panel Replacements at Various Locations
Infrastructure
Post-Bid
Omaha, NE 68102

228th Circle and West "Q" Road Improvements (Grading, Paving, and Erosion Control)
Infrastructure
Results
$258,812 CJ est. value
Omaha, NE 68102

Sanitary & Improvement District No. 331 Paving Maintenance 2023 (Aspen Creek North)
Infrastructure
Post-Bid
$140,000 CJ est. value
Omaha, NE 68102

2023 Residential Street Resurfacing Package 2 - Various Locations
Infrastructure
Results
$5,359,261 CJ est. value
Omaha, NE 68102

District 1 Yard Parking Lot Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Omaha, NE 68112

Last Updated 07/06/2023 04:05 PM
Project Title

2023 Pavement Reconstruction - SID 568 Majestic Pointe

Physical Address View project details and contacts
City, State (County) Omaha, NE 68102   (Douglas County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project is briefly described as follows: Unit Base Bids: The work to be performed in this improvement shall consist of removing all failed pavement panels, installing sidewalk in outs F an H, and modifying the roundabout on Kilpatrick Parkway to include curb ramp crossings, along with any other items of work incidental and necessary for a completed project. Envelopes containing the bids shall be sealed and must be accompanied by a Certified Check or Bidder's Bond in the amount not less than 5% of Bidder's maximum bid price (determined by adding the base bid and all alternates). The check(s) or bond(s) shall be made payable to S.I.D. 568 of Sarpy County, Nebraska, as security that the bidder(s) to whom the award(s) are made will enter into contract to build the improvements bid upon and furnish the required bonds and insurance. The envelopes containing bids shall be marked as follows: Please make sure bidder's name and address are on said envelope. Clerk of Sanitary and Improvement District No. 568 Attn: Spencer Olson 2111 South 67th Street, Suite 200 Omaha, NE 68106 Proposal For: "SID 568 Majestic Pointe 2023 Street Reconstruction" Omaha, Nebraska The Engineer is Olsson Inc., and all communication relative to the work prior to the opening of bids shall be directed to Spencer Olson (402-341-1116). The Engineer's address is 2111 South 67 th Street, Suite 200, Omaha, NE 68106. The successful bidder shall supply a PW-55 Bond, executed by a corporate surety licensed in the State of Nebraska in an amount equal to 100 percent of the contract price as part of his contract. The Sanitary and Improvement District No. 568 of Douglas County, NE (Majestic Pointe) reserves the right to reject any and all bids and waive informalities in bids submitted. The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement. A. 2023 Pavement Reconstruction - All work shall be completed within 60 days of the start of construction. The Contractor shall begin onsite work between July 2023 and September 2023 and shall notify the Engineer in writing a minimum of 10 calendar days in advance of the date on which the Contractor intends to begin work. The Contractor shall diligently pursue the work to completion within the time specified in the contract. Voluntary shutdown or slowing of operations by the Contractor shall not relieve the Contractor of the responsibility to complete the work within the time specified in the contract

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents