Similar Projects
2020 Roadway Paving and Reconstruction Project Phase II
Infrastructure
Bidding
Sayreville, NJ 08859

Timber Ponds Phase 1 Roadway Improvements
Infrastructure
Bidding
Monmouth Junction, NJ

2019 Road and Sewer Improvements on Various Roads
Post-Bid
South Plainfield, NJ

2020 Pavement Management Program - Phase II
Post-Bid
East Brunswick, NJ 08816

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Order for Professional Services No. T3769 Supervision of Construction Services for Turnpike Berm Surfacing Revisions, Milepost 48 to 83
Results
Less than $12,000,000 est. value
Woodbridge, NJ 07095

2020 Road and Sewer Improvements on Various Roads
Post-Bid
South Plainfield, NJ 07080

Old Stage Road Resurfacing
Results
East Brunswick, NJ 08816

Roadway Resurfacing Milepost 83 to 122 Section 19, 22 and 23
Post-Bid
Woodbridge, NJ 07095

Lindquist Park Area Road Improvements
Results
$1,441,280 est. value
Edison, NJ 08817

Jules Lane Roadway Improvements
Post-Bid
$300,000 to $400,000 est. value
New Brunswick, NJ 08901

John T. O'leary Boulevard Improvements
Results
South Amboy, NJ 08878

Repair to Campus Walkways and Roadways
Post-Bid
Edison, NJ 08818

Hot Mix Asphalt Material for Road Resurfacing
Results
$598,000 est. value
Piscataway, NJ 08854

2020 Milling and Resurfacing Program
Post-Bid
Woodbridge, NJ 07095

Last Updated 07/22/2021 04:14 PM
Project Title

CDBG Funded Roadway Resurfacing Project at Willard Dunham Drive and Avenue C

Physical Address View project details and contacts
City, State (County) Edison, NJ 08837   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $170,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this contract is to resurface Willard Dunham Drive & Avenue C in the vicinity of the Julius C. Engel Housing Authority as shown on the attached sketch plan or as directed by the Township, in accordance to the project plans and specifications, using funding from the Township's Community Development Block Grant Programs. This project is being completely or partially funded by the Township of Edison with federal funds received from the U.S. Department of Housing and Urban Development (HUD) as part of the Community Development Block Grant (CDBG). Therefore, the Contractor is subject to the provisions of the Federal Labor Standards (Davis Bacon), which are conditions of the contract. The major items of work for this project consist of milling and resurfacing the roadway with 2inches of Hot Mix Asphalt 9.5M64 Surface Course; the removal and replacement of curbing, and/or curb and gutter where specified; the removal and reconstruction of curb returns and sidewalk for ADA-compliant public sidewalk curb ramps; traffic striping; and other incidental appurtenances necessary for a complete job.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents