Similar Projects
Central Utilities Plant #5 Air Compressors Replacement and Upgrades
Renovation
Sub-Bidding
$210,000 CJ est. value
Birmingham, AL 35205

JEFCO HVAC Addition to Lipscomb Elementary Gymnasium
Renovation
Sub-Bidding
$2,000,000 CJ est. value
Bessemer, AL 35020

Spain Wallace Second Floor Molecular Lab Fan Coil Unit Replacement
Alteration
Post-Bid
Birmingham, AL

Central Utilities Chilled Water System Upgrades
Alteration
Post-Bid
$900,000 to $1,200,000 est. value
Birmingham, AL 35233

HVAC Upgrades for the Midfield City Schools
Alteration
Results
Midfield, AL 35221

National Boiler Inspection Services
Term Contract
Results

Highlands 6th and 7th Floor Air Handler Replacement
Alteration
Post-Bid
Birmingham, AL 35205

HVAC Upgrades Installation of Bipolar Ionization or Non-Thermal Plasma Technology for Midfield City Schools
Renovation
Results
Birmingham, AL

Chauncey Sparks Center Room 220 Install Ventilation
Alteration
Post-Bid
$30,000 to $55,000 est. value
Birmingham, AL 35233

HVAC Upgrades Phase II
Alteration
Results
$1,300,000 est. value
Birmingham, AL

Callahan Eye Hospital CEH AHU Replacement
Alteration
Post-Bid
Birmingham, AL 35233

Bluff Park Elementary School Fluid Cooler Replacement
Alteration
Results
$310,646 est. value
Hoover, AL 35226

Assess and Correct HVAC Unit for Bessemer City Middle School Gymnasium
Alteration
Post-Bid
Bessemer, AL 35020

HVAC Improvement for the Midfield High School, Career Tech and Rutledge Middle School
Alteration
Results
Midfield, AL 35221

Parker Dominic Air Purifier Parts and Emergency Repair Contract
Term Contract
Post-Bid
Anniston, AL 36201

Last Updated 01/19/2023 04:14 PM
Project Title

HVAC Split Unit Upgrades

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35233   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $5,472,000 [brand] Estimate
Plans Available from Agency's Affiliate - 10/18/22
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 19, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** HVAC Split Unit Upgrades. The project includes, but is not limited to, replacement of existing HVAC Split Units and/or system, and all related work as indicated on the Bid and Construction Documents. A cashier's check or bid bond payable to Birmingham City Schools, Birmingham, Alabama, in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and statutory Labor and Material Payment Bonds, and insurance in compliance with requirements, will be required at the signing of the Contract. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as amended, and must show such evidence of license before bidding or bid will not be received or considered by Architect or Owner; The bidder shall show such evidence by clearly displaying their current license number on the outside of the sealed envelope in which the proposal is delivered; Bidder must also include their current license number on the Proposal Form. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of NINETY (90) days. This project is being bid without sales taxes according to Act 2013-205 (of the Alabama Legislature). However sales tax for the base bid and all other bid items must be accounted for on the contractor's Bid Proposal Form. ABC Form C-3A indicates how the sales tax shall be accounted for on the bid proposal form and shall be modified by the project architect as appropriate for bid items on each project. Completion Time: Work shall commence on the earlier of either the date of the owner's written "Notice to Proceed" or the contractor's receipt of the fully executed contract and shall be "Substantially Complete" within 240 Consecutive Calendar Days thereafter. Supervision: Contractor to provide Superintendent (s) to ensure proper supervision for all work. The Owner Reserves the Right to Reject Any or All Proposals and to Waive Technical Errors if, in Their Judgment, the Best Interests of the Owner Will Thereby Be Promoted. Architect: Charles Williams & Associates Inc. 3601 8th Ave. So. Birmingham, Al 35222 Phone: (205) 250-0700 Attn: Christa Vandiver Christa@cwilliams-arch.com Owner: Birmingham Board of Education 2015 Park Place North Birmingham, Alabama 35203 Phone: (205) 231-4885 Attn: Donald Mccrackin Dmccrackin@bhm.k12.al.us PROJECT ADDRESS Minor Elementary School Barrett Elementary School 2425 Avenue S 7601 Division Avenue Huffman Middle School Sun Valley Elementary 517 Huffman Road 1010 18th Avenue NW

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents