Similar Projects
Group 4-17-ST 8
Infrastructure
Conception
$5,114,012 CJ est. value
Hawley, PA 18428

Group 4-17-ST 8
Infrastructure
Conception
$5,114,012 CJ est. value
Hawley, PA 18428

SR 652 Slide
Infrastructure
Design
$50,000 CJ est. value
Honesdale, PA 18431

SR 652 Slide
Infrastructure
Design
$50,000 CJ est. value
Honesdale, PA 18431

Lacawac Sanctuary Environmental Education Center General - New Construction
New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Lake Ariel, PA 18436

2023 Paving Projects
Infrastructure
Bidding
$80,000 CJ est. value
Jefferson Township, PA 18436

State Correctional Institute (SCI) Waymart - Exterior Building Envelop and Site Infrastructure Upgrades
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Honesdale, PA 18431

Road Repair of Westcolang Road
Infrastructure
Post-Bid

Daniels Road
Results
South Canaan, PA 18459

Hawley Borough Paupack Street, Falls Avenue and Pike Street Improvements
Results
Hawley, PA 18428

Grove Street Terrace
New Construction, Infrastructure
Pending Verification
$13,500,000 CJ est. value
Honesdale, PA 18431

SR 4010 over Shadigee Creek
Infrastructure
Conception
$765,000 CJ est. value
Starrucca, PA 18462

SR 3020 over Tributary Quinsigamund Lake
Demolition, New Construction, Infrastructure
Design
$1,150,000 CJ est. value
Waymart, PA 18472

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Starrucca Borough Fairmount Road Improvement
Results
Starrucca, PA 18462

Last Updated 01/20/2023 07:05 AM
Project Title

SR 4041 over Riley Creek

Physical Address View project details and contacts
City, State (County) Lakewood, PA 18439   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Wayne County, Preston Township, State Route 4041 (Rock Lake Road) Primary Improvement Type: Replace/Rehab As of January 20, 2023, the project is in development stage. Anticipated letting date is July 27, 2023. PennDOT - SR 4041 over Riley Creek *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents