Similar Projects
Golden Triangle Industrial Park Water Treatment Plant 1 Rehabilitation
Infrastructure
Bidding
$300,000 est. value
Columbus, MS

Facility Improvements Contract A - Weir Improvements
Renovation
Post-Bid
$1,300,000 est. value
Fulton, MS 38843

Water Treatment Facility (Contract A)
Post-Bid
Grenada, MS

O.B. Curtis Water Treatment Plant Membrane Filter System Train 5 Replacement
Renovation
Results
Jackson, MS

Starlanding Water System Improvements Phase II - Water Treatment Plant
New Construction
Results
$2,683,300 est. value
MS

Water Plant 1 Rehabilitation Phase 1
Post-Bid
$976,911 est. value
Hattiesburg, MS

North Pleasant Hill Water Plant Rehabilitation
Renovation
Results
$1,200,000 est. value
Olive Branch, MS

City of Grenada Water Treatment Facility Contract "B" Fort Hill Treatment Plant
Renovation
Post-Bid
Grenada, MS

JH Fewell Water Treatment Plant Corrosion Control Chemical Feed System Improvement Project
Renovation
Results
Jackson, MS 39202

Nanofiltration Water Treatment Plant located in Gautier, Mississippi
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Gautier, MS

Engineering Services
Term Contract
Post-Bid
Philadelphia, MS

Repair Wastewater Treatment Systems
Renovation
Post-Bid
$250,000 to $500,000 est. value
Flowood, MS 39232

NTS Water Association
Renovation
Post-Bid
Meridian, MS 39304

Phase III Water Treatment Plant and System Upgrades
New Construction
Post-Bid
Iuka, MS

Water System Improvemnts
New Construction
Post-Bid
$508,000 est. value
Bassfield, MS

Reported 06/15/2022 12:00 AM
Project Title

Construction of 1,000 GPM Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Walls, MS   (DeSoto County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of 1,000 GPM Water Treatment Plant consisting of Concrete Clearwell & Catch Basin, Aerator, Chemical/Control Building, Iron Removal Filters, Electrical Controls & Plant Piping

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents