Similar Projects
Installation of Water and Wastewater Services for Ute Tribe Water Systems
Infrastructure
Design
$160,000 CJ est. value
Fort Duchesne, UT 84026

Vernal City Independence Park Pickleball Courts
Infrastructure
Design
$500,000 CJ est. value
Vernal, UT 84078

500 W SRTS Sidewalk Project
Infrastructure
Post-Bid
Vernal, UT

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

Moenave Trail Improvements
Results

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Results
Less than $3,308,642 est. value

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

2021 TIIMP - Crack Seal Project
Results
Less than $216,000 est. value
Vernal, UT

2021 Chip Seal Project
Infrastructure
Post-Bid
Naples, UT

Woods Road Overlay
Results
Less than $1,775,250 est. value
UT

Asphalt Road Repairs and Resurfacing
Infrastructure
Post-Bid
Tridell, UT

Moonshine Arch Trailhead Improvements Non-Urban
Results
$120,017 est. value
UT

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

S Roadway Improvements
Results

Jones Hole National Fish Hatchery - Water System Improvements
Infrastructure
Post-Bid
$150,000 CJ est. value
Vernal, UT 84078

Last Updated 08/31/2022 11:11 AM
Project Title

Maeser Water Office Frontage Project

Physical Address View project details and contacts
City, State (County) Vernal, UT 84078   (Uintah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Maeser Water Improvement District is now accepting bids for the construction of the Maeser Water Office Frontage Project. The construction will construct 540' of curb & gutter and 547' of sidewalk and appurtenances along the office frontage. The Work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances thereto as included in the Contract Documents. A general description of the Work is set forth in the Invitation to Bid

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents