Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Touchless Water Fountains Installs
Post-Bid
Lakewood, CO 80215

SCF DA Tank Docking Station Installation Bid Pack 2
Post-Bid
Less than $1,000,000 est. value
Colorado Springs, CO 80910

AFB 2141 CC 2018 Hail Damage Repairs
Results
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

16" Sleeve Valve and Spool Refurbishment
Results
Berthoud, CO 80513

Boiler Replacement at Baseline Water Treatment Plant
Post-Bid
Lafayette, CO 80026

Fixed Asset Replacement (FAR) Projects - Civil Mech
Results
Denver, CO 80229

South Pool Boiler Replacement
Post-Bid
Superior, CO 80027

Chiller Plant, Fort Collins, Colorado
Results
$1,000,000 to $5,000,000 est. value
Fort Collins, CO 80521

Library Leak & Temp Detection/Shut-Off Upgrade
Post-Bid
Denver, CO

Blake Boiler Replacement
Results
Denver, CO 80202

Justice Center Water Heater
Post-Bid
Black Hawk, CO 80422

General Civil Construction On-Call - Large Prime
Term Contract
Results
Less than $25,000,000 est. value
Denver, CO

FCF Boiler Number 1 Equipment Bid Pack 1
Post-Bid
Less than $800,000 est. value
Canon City, CO

Last Updated 12/29/2021 05:20 PM
Project Title

J--Amend 1 Reverse Osmosis Water/Pre-Treatment System

Physical Address View project details and contacts
City, State (County) Carr, CO   (Weld County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Seeking Funding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall: Remove and replace the current system with and a new RO and pretreatment system that will adequately meet our needs based on the information provided. Dispose of all existing components Select a new treatment system that shall adequately remove contaminates of the groundwater to EPA Drinking Water Standards Create an operation and maintenance manual for the system. Create a maintenance schedule for all provided components and recommend when different components shall be cleaned, replaced, and inspected based on the quality of the water. Provide one-year workmanship warranty.Ensure all new components shall be able to handle flows. National Black-Footed Ferret Conservation Center 19180 NE Frontage Road Carr, Co 80612

Details

Division 02 - Existing Conditions, Physical Decontamination, Reverse-Osmosis Decontamination.
Division 40 - Process Integration, Water Process Piping, Reverse-Osmosis Water Process Piping.
Division 46 - Water and Wastewater Equipment, Demineralization Equipment, Reverse-Osmosis and Nanofiltration Membrane Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents