Similar Projects
Russellville Schoolhouse Trails Phase III
Infrastructure
Bidding
$1,000,000 CJ est. value
Russellville, AR 72801

Engineering, Planning and Development
Post-Bid

Architectural Services McEver Hall Renovation
Renovation
Post-Bid
Russellville, AR

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Results
$2,000 to $3,500,000 est. value

Southern Region Facilities Architect-Engineer Multiple Award Contracts
Results
$2,500 to $6,000,000 est. value

Microgrid Architectural And General Engineering Services
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

Regional Design/Build General Construction Indefinite Delivery Indefinite Quantity (IDIQ)
New Construction
Results

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Supplemental Architecture and Engineering Services for New Mexico
Term Contract
Post-Bid

USPS IQ AE Environmental Southern (Area #1 & #2)
New Construction, Term Contract
Results
Washington, DC

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

USPS IQ A/E Services
Renovation
Results

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

East 22nd Street Drainage Improvements
Infrastructure
Results
$300,660 CJ est. value
Russellville, AR 72802

Reported 08/06/2022 12:00 AM
Project Title

RFQ Design - Construction of a New Ambulance Service Headquarters

Physical Address View project details and contacts
City, State (County) Russellville, AR 72801   (Pope County)
Category(s) Government/Public, Heavy and Highway, Professional Services
Sub-Category(s) Architectural, Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Accepting Qualifications, Construction Start Expected February 2023,
Bids Due View project details and contacts
Estimated Value $7,500,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

POPE County, Arkansas, is interested in acquiring the services of an architect and construction manager advisor to provide the necessary services for: Project #1 - Construction of a new Ambulance Service Headquarters The project is proposed to be funded by federal, state and/or local sources, including but not limited to, funds from the American Rescue Plan. Procedures for selection of an architect and also a construction manager will be in accordance with procurement requirements of State and Federal Law. POPE County is an Equal Opportunity/Affirmative Action Employer. Disadvantaged Business Enterprise, Women Business Enterprise and Small Business Firms are encouraged to apply. The method of Contractor Selection has not been determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents