Similar Projects
Blair Street, South - 11128 - City of Madison
Alteration
Conception
$1,627,000 est. value
Madison, WI 53774

Mosaic Ridge Construction Financing - 10079
Alteration
Conception
$1,800,000 est. value
Madison, WI 53711

Braxton Pl Resurfacing and La Mariposa Lane (New Street)
Infrastructure
Design
$900,000 est. value
Madison, WI

Old Middleton Underpass - 11959 - City of Madison
Infrastructure
Design
$1,500,000 est. value
Madison, WI 53705

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 est. value
Madison, WI

Olin-Turville Court and East Lakeside Street Resurfacing Water Utilities
Infrastructure
Bidding
$700,000 est. value
Madison, WI 53715

2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

2021 Road Paving
Post-Bid
McFarland, WI

Winnequah Road Bridge Replacement
Results
Monona, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Halo Lane and Twilight Trail Reconstruction
Infrastructure
Design
$700,000 est. value
Madison, WI

Safe Streets Madison 2022 - Group 2
Infrastructure
Bidding
$700,000 est. value
Madison, WI

2021 Sealcoating
Renovation
Post-Bid
McFarland, WI

Mastic Pavement Repair
Term Contract
Results
WI

Hammersley Road Resurfacing w/Utilities Phase 1
Infrastructure
Bidding
$2,000,000 est. value
Madison, WI 53711

Last Updated 07/06/2022 07:52 AM
Project Title

Main Street (CTH N) Urbanization, Contract 2-2022

Physical Address View project details and contacts
City, State (County) Cottage Grove, WI 53527   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: 500 linear feet of RCP storm sewer; 3,900 square yards of asphalt pavement milling; 7,000 square yards of asphalt pavement pulverization; 11,300 tons of dense graded base; 3,000 linear feet of concrete curb and gutter, 3,800 tons of asphalt pavement (including a roadway and a multi-use path); as well as pavement markings, signage, a rapid rectangular flashing beacon (RRFB), and lighting. The roadway will be kept open to traffic throughout construction and includes a staged traffic control plan.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents