Similar Projects
Luella Storage
New Construction, Infrastructure
Conception
$9,000,000 est. value
Locust Grove, GA 30248

Southern Crescent Institutional and Independent Living Facility
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
McDonough, GA 30253

Jonesboro Road Indoor Self-Storage Facility
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
McDonough, GA 30253

Sandy Ridge Road Development - Henry County
Infrastructure
Design
$1,000,000 CJ est. value
McDonough, GA 30252

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - Passive Park
Infrastructure
Bidding
$300,000 CJ est. value
McDonough, GA 30253

New Satellite Government Office - Henry County
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
McDonough, GA 30253

Sewerage System Improvements
Infrastructure
Post-Bid
$4,000,000 CJ est. value
McDonough, GA 30253

Agriculture Meter Installation
Infrastructure
Results

Turner Church Pump Station Force Main Additions
Infrastructure
Results
$1,132,581 CJ est. value
McDonough, GA 30252

Market Place Boulevard Retail Building
New Construction, Infrastructure - 8,376 SF
Construction
$2,200,000 CJ est. value
Locust Grove, GA 30248

Gardner Logistics Park - Phase III
New Construction, Infrastructure - 1,500,000 SF
Pending Verification
$162,000,000 CJ est. value
Locust Grove, GA 30248

Pine Grove Road Warehouse
New Construction, Infrastructure - 1,300,000 SF
Pending Verification
$140,000,000 CJ est. value
Locust Grove, GA 30248

East Lake Parkway Mixed Use
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
McDonough, GA 30253

MUNI - Rezone - Brannan Road / Residential Subdivision - Pulte Group, Inc.
New Construction, Infrastructure
Design
McDonough, GA 30253

Last Updated 02/27/2023 02:02 AM
Project Title

Pine View and Memorial Park Lift Station and Force Main Rehabs

Physical Address View project details and contacts
City, State (County) Stockbridge, GA 30281   (Henry County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Stockbridge is soliciting competitive sealed bids from qualified Contractors to provide City of Stockbridge, Georgia's "Pine View and Memorial Park Lift Station and Force Main Rehabs" project., including all the supervision, materials, equipment, labor, and all other items necessary to complete said work and services in accordance with the terms of this Invitation To Bid. This ITB invites Bids from qualified firms, according to the requirements set forth in the contract documents, including the format and content guidelines specified. PROJECT OVERVIEW/ SCOPE OF WORK The work to be completed shall consist of furnishing all labor, equipment, and materials necessary to rehabilitate the Pine View and Memorial Park Lift Stations and installing approximately 4,300 linear feet of 6" PVC force main including, but not limited to, temporary bypass pumping, removing existing pumping equipment and appurtenances, abrasive blasting the existing wet wells, making cementitious repairs, applying a protective coating to wet wells, installing new submersible pumps, installing valves and vaults, jacking and boring, horizontal directional drilling, electrical, mechanical, SCADA system, grassing, soil erosion and sedimentation control measures, and all appurtenances necessary to provide a complete installation. Due to current health concerns, the City of Stockbridge Procurement Division will be conducting Pre-bid Meetings and Public Bid Opening 100% online! Any questions pertaining to the requirements of the Contract Documents and Technical Specifications, either procedural or technical, shall be in writing and are to be submitted to the City of Stockbridge; Attention: Lindell Y. Miller, CPPO via email at ProcurementDivi sion@cityofstockbridge-ga. gov by the question answer period listed below. Reference: "Pine View and Memorial Park Lift Station and Force Main Rehabs" project -ITB# 2023-0001". The deadline for questions is Friday, February 10th, 2023, at 12:00 Noon EDT. Each bid shall be accompanied by a Bid Bond in an amount of not less than ten percent (10%) of the total bid amount. The Bid Bond may be in the form of a bond issued by a surety acceptable to the City or a cashier's check made payable to the City of Stockbridge, Georgia. The entire Bid Bond shall be forfeited to the City of Stockbridge, Georgia as liquidated damages if the bidder fails to execute all sets of the Contract Documents and provide Performance and Payment Bonds within fifteen (15) days after receipt of the documents. The successful bidder will be required to furnish a contract Performance Bond and a Payment Bond, each in the sum of one hundred percent (100%) of the total amount bid and provide insurance coverage as required in the Contract Documents No bid may be modified, withdrawn, or canceled for a period of sixty (60) days after the time designated for the receipt of Bids or until the Bidder is notified by the City, whichever is sooner. The City reserves the right to accept or reject any and all bids and to waive irregularities, technicalities, and formalities. Note: For more information, please refer to the Instruction to Bidders and the Contract Documents, which govern and supersede this Invitation To Bid (ITB).

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents