Similar Projects
Z2da--554-22-138 Reconfigure Gas Lines For Pulmonary F2
Term Contract
Design
Aurora, CO 80045

Underground Fuel Line Upgrade or Replacement
Infrastructure
Bidding
$200,000 est. value
Broomfield, CO 80021

Wastewater Treatment Plant - Treatment Chemicals
Post-Bid
Louisville, CO

Fuel Tank Removal and Replacements
Post-Bid
Golden, CO 80403

2020 Joint Chemical Bid
Results
Cortez, CO

Greeley Fuel Tanks Replacement
Results
Greeley, CO 80631

Natural Gas Main and Service Line Replacement
Infrastructure
Post-Bid
Colorado Springs, CO

Drake Temporary Natural Gas Generator Installation
Results
CO

Above Ground Fuel Tanks
Infrastructure
Post-Bid
CO

South Platte Renew Methanol Piping Replacement
Results
Englewood, CO 80110

POL Tank Inspection (Pet) Peterson AFB
Term Contract
Post-Bid
Colorado Springs, CO

Recycle Backwash Tank Maintenance
Results
Louisville, CO

Fuel System Replacement
Infrastructure
Post-Bid
CO

Drake Temporary Natural Gas Generation Meter Services
Results
CO

Logan County Road and Bridge Fuel System
Infrastructure
Post-Bid
CO

Last Updated 04/25/2022 11:52 AM
Project Title

Y--Replace Underground Fuel Storage Tanks at ROMO

Physical Address View project details and contacts
City, State (County) Estes Park, CO   (Larimer County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes installation of two new metal AST for fuel storage including, but not limited to fuel dispensers, fuel control systems, fuel tank monitoring systems, and power feeds. The work also includes 1) the removal of existing USTs at both sites including, but not limited to removal of tanks, fuel dispensers, fuel lines, fuel control and monitoring tracking systems; and 2) the removal of an above ground propane tank at the East site including propane line abandonment. The project will be constructed under a single prime contract. The work shall be conducted in 2 phases in the following order, with each phase substantially complete before beginning the next phase: Phase 1: Install new ASTs and associated improvements. Work of this phase shall be available for park use prior to beginning Phase 2. Phase 2: Remove existing USTs and propane tank and associated appurtenances. Option A - Dewatering: This item consists of dewatering the tank removal excavation if groundwater is encountered at the East Headquarters during removal of the existing unleaded gas and diesel underground fuel storage tanks including obtaining a NPDES Construction General Permit

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents