Similar Projects
District 1 Materials Lab HVAC Replacement
Bidding
Bartow, FL 33830

FDOT HVAC Install: Sneads WB Weigh Station
Results

Unit 3 Cooling Tower MCC Building
Results
$584,542 est. value
Lakeland, FL 33801

Traviss Technical College Replace Chiller, Building 1
Design
Less than $2,250,000 est. value
Lakeland, FL 33803

HVAC Preventive Maintenance Government Services
Term Contract
Results
Bartow, FL 33831

Fifth Floor Kitchen Range Hood System Renovation Project
Results
Lakeland, FL

Service and Maintenance of City Owned Refrigeration and Heating and Cooling Systems HVAC Inventory
Term Contract
Post-Bid
Bartow, FL

HVAC Replacement and History and Culture Center Interior Renovation
Renovation - 3,000 SF
Results
Lakeland, FL 33803

HVAC Repair and Replacement
Term Contract
Results
Lake Alfred, FL 33850

HVAC Repair and Maintenance Services
Term Contract
Results
Lake Alfred, FL 33850

Davenport HVAC Preventative Maintenance, Repair and Replacement
Post-Bid
Davenport, FL

HVAC and Mechanical Products
Term Contract
Post-Bid

Rooftop Unit (RTU) Replacement
Results

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Service and Maintenance to City Owed Refrigeration and Heating/Cooling Systems
Term Contract
Results
Bartow, FL 33830

Reported 02/26/2021 12:00 AM
Project Title

Market Lofts Air Conditioner Replacement

Physical Address View project details and contacts
City, State (County) Lakeland, FL 33801   (Polk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install (10) heat pumps R410a with heat 208/230/1 To provide air handler unit stands with secondary condensate pan & float switches To provide Honeywell 8000 connect to existing control wire To provide Reusr refrigerant piping (Flush) and provide condenser pads concrete 40x40 To provide condensing units to be installed with hurricane attachment to concrete pads Must disconnect and reconnect electric power to system Must flush out existing condensate drainpipe before reconnecting to new system Must provide one (1) year warranty on all parts & labor on equipment from date of start up Must be able to secure all necessary permits Pricing should include standard lead time for submittals, manufacturing, shipping, mobilization of materials, equipment and manpower.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents