Similar Projects
NWB Shoshone Outbuildings - 50% CD
Alteration
Post-Bid
Preston, ID

Replace Sink
Alteration
Post-Bid
ID

exp - Holt Arena President's Deck Mechanical and Plumbing
Alteration
Post-Bid
$200,000 est. value
Pocatello, ID

2022, East Ustick Road Trunk Line, Dixie Drain to Florida Avenue
Infrastructure
Results
$1,244,889 CJ est. value
Caldwell, ID 83605

Vault Toilet Pumping Service
Term Contract
Post-Bid
Boise, ID 83702

Spring Valley Wastewater Treatment Plant Phase 1
New Construction, Infrastructure
Results
$17,087,277 CJ est. value
Eagle, ID 83616

FY22 Capital Maintenance, Phase 1, Boise
Infrastructure
Post-Bid
$15,000,000 CJ est. value
Boise, ID 83702

Wastewater Treatment Plant Dewatering Project
New Construction, Renovation, Infrastructure
Post-Bid
$9,500,000 CJ est. value
Idaho Falls, ID 83402

High Density Polyethylene Pipe (HDPE) Lining
Term Contract
Post-Bid
Boise, ID 83702

Cabinet Mountains Water District - Water System Improvements Project - Phase - 2
Renovation, Infrastructure
Post-Bid
$700,000 CJ est. value
Bonners Ferry, ID 83805

Septic Pumping
Infrastructure
Sub-Bidding
$20,000 CJ est. value
Boise, ID 83702

Last Updated 02/16/2023 05:42 PM
Project Title

D2 Materials Lab Remodel - Bid Package 2

Physical Address View project details and contacts
City, State (County) Lewiston, ID 83501   (Nez Perce County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

BP-02 (FM22234) Plumbing The project scope includes an interior renovation, providing additional laboratory areas, upgraded HVAC and ventilation, and other miscellaneous improvements. The Owner reserves the right to reject any or all bids, waive any informality or irregularity, and award a contract that is deemed in the best interest of the Owner. This is a Construction Management Project. Bids for separate work packages must be on the bid form enclosed in the bid documents and accompanied by a certified or cashier's check of an Idaho Bank, or bid bond, with Idaho State Licensed Surety Company as surety, in an amount not less than 5% of the total bid made payable to: Idaho Transportation Department. The security shall be forfeited by the bidder in event of failure to sign the contract or furnish the required Payment and Performance Bond. Performance and Payment Bonds in the amount of (100%) of the Contract amount will be required within (10) days after receipt of a properly prepared agreement between the Owner and the Contractor. Costs for bonds shall be included in contractor's bid amount. Contractors shall be licensed in the State of Idaho in accordance with the provisions of the Idaho Public Works Contractors' State License Law.

Details

8,665 SF.
Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents