Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Y-WHS Multiple Award Indefinite-Delivery Indefinite-Quantity Chesapeake Bay Total Maximum Daily Load (TMDL) Reduction and Paving Contract (TMDL/P)
Term Contract
Bidding
Less than $45,000,000 est. value
Arlington, VA

12th Street South Complete and Transitway Extension
Infrastructure
Bidding
Arlington, VA 22202

Arlington National Cemetery
Post-Bid
$50,000,000 est. value
Arlington, VA

ANC Road Construction
Post-Bid
$50,000 to $15,000,000 est. value
Arlington, VA

ANC McPherson Area Road Reconstruction
Results
$10,000,000 to $25,000,000 est. value
Arlington, VA

2020 Plant Mix
Results
Less than $4,188,000 est. value

Boundary Channel Drive at I-395 Interchange
Post-Bid
Less than $15,000,000 est. value
Arlington, VA 22202

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Streetscape Improvements at the Intersection of North Pershing and Washington Boulevard
Post-Bid
Arlington, VA 22200

Parking Lot Repaving
Results
Arlington, VA

2020 Plant Mix
Results
Less than $4,936,000 est. value

Water Activated Cold Patch
Term Contract
Results

Slurry Seal Treatment
Term Contract
Results
VA

Street Improvement Project
Results
Arlington, VA 22201

Last Updated 09/09/2021 07:03 AM
Project Title

Arlington National Cemetery - Realignment of Columbia Pike

Physical Address View project details and contacts
City, State (County) Arlington, VA 22225   (Arlington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the realignment of Columbia Pike and S. Joyce Street, replacement of Southgate Road with a new segment of S. Nash Street, the expansion of Foxcroft Heights Park, and the modification of the Columbia Pike/Washington Boulevard interchange. Other work includes construction of pedestrian and bicycle facilities to increase multimodal connectivity, installation of street lighting to enhance safety, and extensive utility relocation. Work will also include site preparation for a second contract to be awarded prior to completion of the DAR project. This will include the construction of five retaining walls, one tunnel, and mass grading to allow the completion of the Southern Expansion performed by a second contractor.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents