Similar Projects
Missionary Village Lift Station Improvements - 6022386 - Manatee County
Alteration
Design
$2,226,000 est. value
Bradenton, FL 34212

Nassau Water Reclamation Facility (WRF) Exploratory Injection Well
Infrastructure
Bidding
$950,000 est. value
Jacksonville, FL

North Water Treatment Plant Feedwater Pump and VFD Replacement
Infrastructure
Bidding
$450,000 est. value
Jensen Beach, FL 34957

Well Testing, Drilling And Maintenance
Demolition, Term Contract
Post-Bid
FL

Well Boring and Drilling
Post-Bid
Tampa, FL

Well House Replacement - Contract II
Results
Less than $150,000 est. value
Cottondale, FL 32431

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

Plugging and Abandonment of Orphaned Oil and Gas Well (Sevier 14-1)
Infrastructure
Bidding
$250,000 to $500,000 est. value
Spring Hill, FL 34611

Flygt and ABS Pumps, Parts and Repairs
Post-Bid
FL

Pump Rehabilitation and Repair
Results
Cape Coral, FL 33915

New Well at McGrady Road Site Security Residence
Infrastructure
Bidding
$12,000 est. value
Wimauma, FL 33598

Cudjoe Regional Advanced Water Reclamation Facility Deep Injection Well Inspection
Alteration
Post-Bid
Cudjoe Key, FL

WTP Improvements & New Potable Well #2
Results
Less than $300,000 est. value
Astatula, FL 34705

Springtree Biscayne Aquifer Well S-23
Infrastructure
Bidding
$176,251 est. value
Sunrise, FL 33351

Construction Services for Well 3 at Water Treatment Plant 2
Infrastructure
Post-Bid
$750,000 est. value
Mount Dora, FL 32757

Last Updated 07/06/2022 11:02 AM
Project Title

Southwest Wellfield Project, Phase 1; West Polk Lower Floridan Aquifer Project Phase 1; Construction Manager At Risk, Polk Regional Water Cooperative

Physical Address View project details and contacts
City, State (County) Winter Haven, FL   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $462,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents