Similar Projects
Intersection Improvements on U.S. Route 1
Infrastructure
Bidding
$7,500,000 CJ est. value
Westport, CT 06880

Furnish Retaining Wall Products
Alteration
Post-Bid
Manchester, CT

Slab and Coating Repair (H)
Alteration
Post-Bid
Hartford, CT

Installation of a Concrete Pad at Manchester High School
Results
Manchester, CT 06040

Madison Town Hall Concrete Step Project
Results
Madison, CT

Hoist and Concrete Repairs, Stamford Hurricane Barrier
Term Contract, Alteration
Post-Bid
Stamford, CT 06902

General Construction Equipment, Labor and Material Rates
Term Contract, Alteration
Results
Naugatuck, CT

Remediation Services for Crumbling Concrete Foundations
Alteration
Post-Bid
Hartford, CT

Pre-Cast Concrete Dugouts
Infrastructure
Results
$98,500 est. value
Newington, CT 06111

Concrete Pads for Pavilions
Alteration
Post-Bid
Meriden, CT 06450

Demolition and Removal of Existing Concrete Slab and Installation of New Concrete Slab
Alteration
Results
Southington, CT 06489

Old State House Piping Repair
Alteration
Post-Bid
Hartford, CT

Concrete Work and Preparations Dugout Construction
Alteration
Results
Winsted, CT 06098

Signage and Site Concrete - North Branford High School Project
Infrastructure, Alteration
Post-Bid
$1,200,000 est. value
North Branford, CT 06471

Outdoor Classroom Concrete Pads
Alteration
Results
Meriden, CT 06450

Last Updated 09/18/2022 11:33 PM
Project Title

Farmington 11 Water Main Replacement

Physical Address View project details and contacts
City, State (County) Hartford, CT 06105   (Hartford County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,698,827 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for the installation of 1400 feet of new 24-inch Water Main on Farmington Avenue, the replacement of water services, the abandonment of water main and the restoration of areas disturbed by the completion of the project along with support equipment and accessories as shown and specified. Requests for clarification are due Wednesday, July 13, 2022 4:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. Answers to questions will be posted by addendum by 4:00PM on Friday, July 15, 2022.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents