Similar Projects
Lewis East Substation Rebuild
Results
$2,213,470 est. value
Mesa, AZ 85201

KOFA Dome Tap Transmission Line Project
Post-Bid
$1,000,000 to $2,500,000 est. value
AZ

Material for a 345Kv Breaker Rebuild w/Erection Engineering Services
Results
Page, AZ

Pinnacle Peak Substation Bypass Breakers FY2020
Post-Bid
Phoenix, AZ

Pinnacle Peak Substation Shunt Capacitor Bank Replacement
Results
$750,000 to $1,500,000 est. value
Phoenix, AZ 85054

APS Evan Churchill Substation
New Construction - 15,268 SF
Construction
$3,000,000 est. value
Phoenix, AZ 85006

Traction Power Substation (TPSS) Batteries
Term Contract
Results
Phoenix, AZ

CMAR Bridges Elementary Addition
Addition - 9,300 SF
Post-Bid
$2,900,000 est. value
Gilbert, AZ 85298

Reported 06/08/2021 12:00 AM
Project Title

Request For Information: Steel Structures for Western Area Power Administration (WAPA)

Physical Address View project details and contacts
City, State (County) State-Wide: AZ, CO, MN, ND, NM, SD, UT
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Market research to obtain information on capable Contractors who will be able to provide various steel structures. Multiple WAPA sites eligible for delivery of these steel structures located throughout the following states: Arizona, California, Colorado, Iowa, Minnesota, Montana, Nebraska, New Mexico, North Dakota, South Dakota, Utah and Wyoming. Delivery points for the steel structures will be in surface storage areas adjacent to all-weather roads.

Details

Electric Substation, New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Schedules for Metals, Schedules for Metal Joists, Steel Joist Schedule, Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Fabrications.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Site Grounding, Site Improvements Grounding, Tower Grounding, Site Lightning Protection, Communications Utilities, Communications Structures, Communications Transmission Towers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents