Similar Projects
Chemical Addition Backup System at Stickney Water Reclamation Plant
New Construction
Bidding
$8,105,172 to $9,811,524 est. value
Stickney, IL

Water Treatment Plants Aerator Replacement
New Construction
Bidding
Kewanee, IL

Water Treatment Plant
Renovation
Post-Bid
Effingham, IL 62401

WPCF Digester Rehabilitation
Post-Bid
Glendale Heights, IL 60139

Water Reclamation Center Dewatering System Improvements
Results
$2,000,000 est. value
Carol Stream, IL 60188

Water Treatment Plant Filter Rehabilitation
Results
Quincy, IL 62301

Core & Main building
New Construction - 12,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Washington, IL

Wastewater Plant
New Construction
Pending Verification
$49,200 est. value
Sterling, IL

Upgrade Sewer Treatment Facility Phase 1 - General
Renovation
Bidding
Less than $250,000 est. value
Vienna, IL 62995

Design-Build Services for South Slope WWTP Controls Improvements
Renovation
Post-Bid
Moline, IL 61265

2020 Biosolids Dewatering Improvements
Results
Less than $330,000 est. value
Glen Ellyn, IL 60137

Water Treatment Plant VFD Replacement
Renovation
Bidding
Geneva, IL 60134

Digester Rehabilitation
Renovation
Post-Bid
Glendale Heights, IL 60139

First Street Water Treatment Plant Brine Tank Replacement
Renovation
Results
Less than $480,000 est. value
Woodstock, IL 60098

Upgrade Sewer Treatment Facility Phase 1 - Plumbing
Renovation, Alteration
Bidding
Less than $800,000 est. value
Vienna, IL 62995

Last Updated 10/01/2021 08:19 AM
Project Title

Digester Complex Improvements

Physical Address View project details and contacts
City, State (County) Oswego, IL 60543   (Kendall County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of all work for construction of the following: 1. Existing Digesters M3 and M5 a. Remove existing and install new fixed, steel digester covers; and b. Install new mechanical mixing systems. 2. Existing Digesters Control Building DCM-1 Improvements a. Modifications to electrical, hydronic heating, and digester gas handling systems; b. Replace HVAC system; c. Remove existing boilers; d. Replace sludge circulation pumps; e. Install new waste gas burner system; and f. New electrical installation for all equipment. 3. Existing Digester Control Building DCM-2; a. New electrical installation for all equipment 4. New Digesters Control Building DCM-4; a. Construct new building with electric and mechanical rooms to serve Buildings DCM-1, DCM-2, and DCM-4. Digesters M3 and M5, and Sludge Holding Tank M4. 5. And all architectural, civil, process, mechanical, electrical, instrumentation, and controls work for a complete and functional wastewater treatment facility.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents