Similar Projects
Southside Market Headquarters
New Construction, Infrastructure - 5,000 SF
Design
$1,000,000 CJ est. value
Elgin, TX 78621

Southside Market Headquarters
New Construction, Infrastructure - 5,000 SF
Design
$1,000,000 CJ est. value
Elgin, TX 78621

SL 230 - Construct Pedestrian Infrastructure
Infrastructure
Bidding
$394,262 CJ est. value
Smithville, TX 78957

SL 230 - Construct Pedestrian Infrastructure
Infrastructure
Bidding
$394,262 CJ est. value
Smithville, TX 78957

SH0021 - Limestone Rock Asphalt (Material Only)
Term Contract
Sub-Bidding
$3,751,884 CJ est. value
Bastrop, TX 78602

Simsboro Aquifer Water Supply Facilities - Package 5 - Electrical and I and C Construction
New Construction, Infrastructure
Sub-Bidding
$35,000,000 CJ est. value
Bastrop, TX 78602

Advanced Metering Infrastructure (Ami) for Water Meter System
Post-Bid
Bastrop, TX 78602

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

World-Wide Water Storage Tank Remediation
Term Contract
Results

Elgin Wastewater Treatment Plant Expansion
Results
$15,422,000 est. value
Elgin, TX 78621

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

FM 535 - Resurface Roadway
Infrastructure
Bidding
$1,486,520 CJ est. value
Rosanky, TX 78953

Simsboro Aquifer Water Treatment Plant - Package 4 - Water Treatment Plant Construction
New Construction, Infrastructure
Sub-Bidding
$850,000 CJ est. value
Bastrop, TX 78602

Asphalt Cold Mix D Asppm Grade 4 High Performance Asphalt to Include Delivery
Infrastructure
Post-Bid
Elgin, TX

Last Updated 09/02/2022 03:10 PM
Project Title

Simsboro Aquifer Water Supply Facilities - Bid Package 2 - 0.5 MG Clearwell

Physical Address View project details and contacts
City, State (County) Bastrop, TX 78602   (Bastrop County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,700,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Simsboro Aquifer Water Supply Facilities - Package 2 - 0.5 MG Clearwell The City of Bastrop is in the process of converting its water supply source from shallow alluvial wells primarily fed by the Colorado River to deep wells that draw from the Simsboro Aquifer; which will provide the City with a reliable, resilient, drinking water supply. This package is for the construction of the 0.5 MG Clearwell. The project consists of the following: A new well field and production facilities Three additional wells will be needed to meet Phase 1 flows, which consist of an average production capacity of 3 MGD and a peak capacity of 6 MGD. Groundwater treatment facilities Based on water quality sampling, a WTP primarily focusing on iron and manganese removal will be needed. It will consist of chemical addition facilities housed in a chemical building and gravity filters housed in a filter building. Once treated, water will flow to a 0.5 MG clearwell Ground Storage Tank (clearwell) 5 MG clearwell, Transmission pump station Transmission pumps will pull water from the clearwell and send it through the 24-inch diameter, 21,500 lf transmission pipeline to GSTs at the Willow Site. Transmission piping - Lift Station and Force Main A 21,500 lf wastewater forcemain will run along the same route as the transmission pipeline to convey wastewater generated during filter backwash and in the Filter Building to the City's wastewater collection system. Associated services Electrical and instrumentation Site development and access Various site improvements, paving, grading, fencing, landscaping.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents