Similar Projects
Keating School Redevelopment
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Pueblo, CO 81004

Fire Station 2 - Pueblo West Metro District
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Pueblo West, CO 81007

ADA Curb Ramps Phase 2 (CDBG)
Infrastructure
Bidding
$100,553 CJ est. value
Pueblo, CO 81006

RFP Engineering - Pueblo West Multi-Modal Consulting Services
Infrastructure
Bidding
$200,000 CJ est. value
Pueblo, CO 81006

Arkansas River Trail Project Phase 4-Rebid
Infrastructure
Post-Bid
$421,689 CJ est. value
Pueblo, CO 81006

UVWS-Laundry Room Upgrades
Demolition, Renovation, Infrastructure
Post-Bid
$30,000 CJ est. value
Pueblo Dep Ac, CO 81001

Wastewater Treatment Facility Engineering Building Sewer Replacement
Infrastructure
Results
$100,000 to $130,000 est. value
Pueblo, CO 81007

Abate and Demolish - Rear Structure
Term Contract, Demolition, Infrastructure
Results
$47,380 CJ est. value
Pueblo, CO 81004

RFP Engineering - Civil Engineering and Design of Northern Avenue Trail, Phase 3
Infrastructure
Pending Verification
$625,000 CJ est. value
Pueblo, CO 81006

Community Aquatics Center
New Construction, Infrastructure - 17,514 SF
Pending Verification
$10,000,000 CJ est. value
Pueblo West, CO 81007

Pueblo Union Avenue Bridge Repair
Infrastructure
Bidding
$3,000,000 CJ est. value
Pueblo, CO 81003

Pueblo Memorial Airport East General Aviation Apron Pavement Rehabilitation
Infrastructure
Post-Bid
$235,000 CJ est. value
Pueblo, CO 81001

General Contractor for Various Wastewater Reclamation Facility Equipment Upgrades
Renovation
Results
$250,000 est. value
Pueblo, CO

Group Care Facility
New Construction, Infrastructure
Pending Verification
$13,500,000 CJ est. value
Pueblo, CO 81004

ADA Curb Ramps - Phase 2 (CDBG)
Infrastructure
Bidding
$2,000,000 CJ est. value
Pueblo, CO 81006

Last Updated 04/25/2023 09:19 AM
Project Title

Filter 4 Overhaul

Physical Address View project details and contacts
City, State (County) Pueblo West, CO 81007   (Pueblo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $198,752 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In general, this project will consist of all necessary labor, supervision, equipment, tools, and materials for rehabilitation of a Roberts Water filtration system. Work to include all associated site work related to the project including but not limited to media removal/disposal offsite and installing new media (supplied by PWMD) per specification dictated by manufacture of these filters, prepping for paint as per MFG specs and recoating with approved materials. See manuals attached for additional information. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Bid Intent Not Available Question Acceptance Deadline 02/02/2023 03:00 PM EST Questions are submitted online No

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents