Last Updated | 07/28/2022 06:05 PM |
Project Title | Replace Roof Buildings #1 & #3 (Sager & Canfield Buildings) |
Physical Address | View project details and contacts |
City, State (County) | Crater Lake, OR 97604 (Klamath County) |
Category(s) | Entertainment/Recreation, Single Trades |
Sub-Category(s) | Misc. Recreational, Roofing |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Goals for Minority Participation for Each Trade 2.4% Goals for Female Participation for Each Trade 6.9% This project will address the roof deterioration on Building #1 - Sager (administration building). This project will remove and replace worn wood shakes, water and ice shield, all dam ged copper flashing, repointing and resetting the cap on the chimney. The damaged deck boards will be replaced. Once the deck and waterproofing is complete, new flashing will be installed and new cedar wood shakes will be installed to complete the roof envelope. This project will address the roof deterioration on Building #3 - Canfield (backcountry office, protection ranger division and natural resources staff). This project will remove and replace worn wood shakes, water and ice shield, all damaged copper flashing. Damaged deck boards will be replaced as needed for the continued structural integrity of the roof system. Once the deck and the waterproofing is complete, new copper flashing will be installed around the chimney and on the eaves and rakes. New cedar shakes will be installed to complete the roof envelope. Pre-proposal questions shall be submitted a minimum of seven (7) calendar days prior to the due date and time for proposals. Submit questions only through email to: Contracting Officer, Alanna Gardner, alanna_gardner@nps.gov REPLACE ROOF BUILDINGS #1 AND #3, CRATER LAKE NATIONAL PARK, KLAMATH COUNTY, OREGON The National Park Service (NPS) at Crater Lake National Park (CRLA), located within Klamath County, Oregon, has a requirement for the replacement of the roofs of Buildings #1 and #3 (Sager and Canfield Buildings). The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation. All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work. Per FAR 36.204 the project range is estimated to be between $250,000 and $500,000. The North American Industry Classification System (NAICS) Code for this requirement is 238160, with a corresponding size standard of $16.5 million in annual gross receipts for the past three years. The Government contemplates award of a single, firm-fixed-price contract. This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected. See Section J Attachment 01: Specifications, and Section J Attachment 02: Drawings, for a detailed description of the requirement. Refer to provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a proposal. A SITE VISIT is scheduled for Thursday, July 7, 2022, at 1:00 p.m. Pacific Daylight Time. RSVP in advance to the Contracting Officer. See Section L of the solicitation for more information. Submit questions only through email to the person listed in Section L. Proposals must be received in their entirety via email as instructed in Section L no later than the date and time specified in Block 13 of the SF 1442. Legacy Doc #: NPS Delivery: 09/11/2023 Delivery Location Code: 0009817685 NPS, CRATER LAKE NP HWY 62 SAGER BLDG CRATER LAKE OR 97604 US Period of Performance: 09/12/2022 to 09/11/2023 Nathan Anderson is designated as the NPS Contracting Officer's Representative (COR) for this contract and will be responsible for certifying receipt and acceptance of the services rendered. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |