Similar Projects
Furnishing and Delivery of Water Meters and AMI Smartpoint Radio Units 2022
Infrastructure
Bidding
Forked River, NJ

Ductile Iron Culvert Pipe
Infrastructure
Bidding
Toms River, NJ

2021 Emergency Repairs for Water and Sewer
Post-Bid
Tuckerton, NJ 08087

Furnishing and Delivering of Cold Water Meters
Term Contract
Post-Bid
Lakewood, NJ 08701

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Emergency Pipe Repairs
Results
Toms River, NJ 08753

2021 Sensus Water Meter Acquisition
Post-Bid
Jackson, NJ 08527

Route 9 Watermain Extension
Results
Lacey, NJ

2021 Neptune Water Meter Acquisition
Post-Bid
Jackson, NJ 08527

Install Underground Water Service, Above-Ground Backflow Preventer
Results
Island Heights, Long Beach, NJ 08732

Emergency Contractor Services - Water and Sewer
Post-Bid
Beachwood, NJ

2021 Emergency Repairs for Water and Sewer
Results
NJ

Emergency Repairs to Utilities at Various State Secured Facilities
Term Contract
Post-Bid

Water and Sewer Main Replacement Phase 3A
Results
Seaside Park, NJ 08752

Pipe and Pipe Fittings
Term Contract, Infrastructure
Post-Bid
Stafford Township, NJ 08723

Last Updated 02/03/2022 03:26 PM
Project Title

Water System Emergency Repair Services

Physical Address View project details and contacts
City, State (County) Bayville, NJ   (Ocean County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be done under this contract shall consist of emergency repairs and/or replacements of all sizes of water system mains on an as needed basis. Repairs shall include excavation, removal/repair/replacement of system components, backfilling, temporary and pennenant restoration and cleanup. The contractor shall provide all labor, equipment, tools, materials, safety equipment and supplies required to complete the repair. All work shall be completed to satisfaction of the Authority Engineer, or his designee. The contract shall be renewable for, one 12 month extension for a total contract of 24 months, should the Authority choose to do so. The Authority's water system consists of 4" thru 20" mains comprised of cement lined ductile iron pipe. Service connections are 5/8 -6". There is in excess of75 miles of total mains at an approximate depth between 3 and 6 feet. There are approximately 600 fire hydrants in the system.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents