Similar Projects
2021 Airfield and Drainage Improvements
Infrastructure
Bidding
Pittsburgh, PA 15231

Cut Slope Remediation
Infrastructure
Bidding
PA

Semicir Street Landslide Remediation
Post-Bid
Pittsburgh, PA 15214

Reinforced Concrete Products
Post-Bid
Monroeville, PA

Carrie Furnace Redevelopment Project - Western Phase
Results
$1,300,000 to $1,500,000 est. value
Monroeville, PA 15146

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Thunderwood Drainage Improvements
Infrastructure
Bidding
Bethel Park, PA 15102

Cowley Park Landslide Remediation
Post-Bid
Pittsburgh, PA 15219

Bridge Demand MTC 12, 20
Results
$1,000,000 to $2,499,999 est. value

Hunt Road Culvert Replacement
Infrastructure
Bidding
Sewickley, PA 15143

Bairdford Park Master Plan Construction B-1 Ballfield Project
Post-Bid
$85,000 est. value
Cheswick, PA 15024

War Memorial Culvert Replacement Project
Results
Pittsburgh, PA 15143

Culvert Pipe Replacement
Infrastructure
Bidding
Allison Park, PA 15101

Combined Sewer Overflow Debris Control
Post-Bid
$30,000 est. value
Etna, PA 15223

Lincoln Avenue Ext STP Remediation
Results
Penn Hills, PA 15235

Reported 08/28/2021 12:00 AM
Project Title

Repair Outfall 911th Air Reserves

Physical Address View project details and contacts
City, State (County) Coraopolis, PA   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13) Replace approximately 220 feet of pipe from Outfall #3 to Catch Basin #3 and shall replace approximately 130 feet of pipe from Outfall #5 to Catch Basin #3. The contractor shall NOT demolish any part of Defense Avenue. The contractor shall install one new manhole and one new storm drain catch basin and excavate only the area where the pipe needs to be replaced to minimize the amount of high vegetation and trees to be cleared.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents