Similar Projects
Schrenk Hall Addition and Renovation - Phase III (Biosciences Building) - Missouri University of Science and Technology
Addition, Renovation, Infrastructure - 108,000 SF
Conception
$52,040,100 CJ est. value
Rolla, MO 65409

Engineering Research Lab (ERL) Addition and Renovation - Missouri University of Science and Technology
Addition, Renovation, Infrastructure - 86,470 SF
Conception
$43,026,000 CJ est. value
Rolla, MO 65409

Saint James Lift Station No. 3 Replacement
Demolition, New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Saint James, MO 65559

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Towne and Campus Apartment Complex-Parking Lot
Infrastructure
Post-Bid
$330,660 est. value
Rolla, MO

FY 2021 Asphalt Phase II
Infrastructure
Results
Rolla, MO

Repair Parking Lot and Loading Dock Infrastructure
Infrastructure
Results
Rolla, MO 65401

Construct A New Parking Lot
Infrastructure
Post-Bid
Rolla, MO 65401

7th Street Sidewalk and Cemetery Trail
Infrastructure
Results
Rolla, MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Resurface on Route 72 from Route
Infrastructure
Results

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Resurface on Route WW and on Route FF
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Pressure Pave Surfacing on Various County Roads
Infrastructure
Post-Bid
MO

Resurfacing from Sugartree Road interchange
Infrastructure
Results
$2,500,000 to $5,000,000 est. value

Last Updated 08/26/2022 12:32 AM
Project Title

Mark Twain National Forest East Gate Boat Ramp Rehabilitation

Physical Address View project details and contacts
City, State (County) Rolla, MO 65401   (Phelps County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Pre-Bid COnference is still scheduled for 17AUG2022 at 1000 Central at the Project Site. There is a lot of construction between Rolla and Saint Robert resulting in delayed traffic. The East Gate to Fort Leonard Wood is closed BUT this does not affet the access to the project location. Barriers are posted immediately after FS Road 1802 which is the road to enter the project site. Start time will be 1000 Central but Forest Service representatives will be on site until 1100. The Central Ozark Region received a significant amount of rain on 16AUG2022. The site is still accessible though the ground is very soft. The Mark Twain National Forest requires some rehabilitative construction work to occur on the boat ramp near the East gate of Fort Leonard Wood in Missouri. This requirement is subject to a Small Business set-aside. See attached solicitation for further information on the project, as well as quote submission details and instructions. The Government is planning a pre-bid/pre-proposal conference, during which potential offerors may obtain a better understanding of the work required. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents