Similar Projects
Butterfield Canyon Xeriscape Landscaping
Term Contract
Sub-Bidding
Salt Lake City, UT 84118

Butterfield Canyon Xeriscape Landscaping
Term Contract
Sub-Bidding
Salt Lake City, UT 84118

Granite Elementary Irrigation Upgrade
Post-Bid
Sandy, UT 84092

Weed Control Services
Post-Bid
Cottonwood Heights, Draper, Midvale, Sandy, UT 84093

Cemetery Phase III Improvements
Results

Tree Pruning and Tree Removal Services
Results
Salt Lake City, UT

Sandy Parks Tree
Post-Bid
Sandy, UT

Landscape Design-Build Services for Right of Way Areas
Results
Bluffdale, UT

Tree Removal
Post-Bid
Riverton, UT 84065

Landscape and Snow Removal for REA
Term Contract
Results
Salt Lake City, UT 84108

Playground Wood Chips
Term Contract
Post-Bid
Sandy, UT

Parley's Canyon Myrtle Spurge Removal
Results
UT

Trail Mountain Lop and Scatter
Post-Bid
Murray, UT 84107

Fairmont Park Stream Access and Beautification
Infrastructure
Results
Salt Lake City, UT 84106

Supply and Spreading Fertilizers at Parks and Golf Courses
Term Contract
Post-Bid
Salt Lake City, UT

Last Updated 08/23/2022 10:07 AM
Project Title

Herriman City Detention Basins

Physical Address View project details and contacts
City, State (County) Herriman, UT 84096   (Salt Lake County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping, Landscaping/Irrigation
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $692,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include but is not limited to the installation of landscape and irrigation systems for five existing detention ponds throughout the city. Although these ponds are graded and include storm drain infrastructure, this project will also include minor re-grading and incidental storm drain improvements. The location of the work is in Herriman City at the following sites: a. Shoshone Detention: southwest corner of the intersection of Butterfield Park Way and 6400 West St b. Jensen Place Detention: southwest corner of the intersection of Hall Crossing Drive and 7300 West St c. Antelope Meadows Detention: northeast of the north end of Wild Tolman Circle. d. Bid Alt. #1 Berwick Detention: west of the northern end of Creek Vista Drive. e. Bid Alt. #2 Rose Canyon Detention: northwest of the intersection of Rose Canyon Road and 7100 West St. Site Visit: Visit and inspect site; take into consideration known and reasonably inferable conditions affecting work. Failure to visit site will not relieve Contractor of furnishing materials and performing work required.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents