Similar Projects
Exterior Door Replacement
Post-Bid
Morrilton, AR 72110

Rehabilitation of a Single Family Owner-Occupied Dwelling
Renovation
Post-Bid
Rogers, AR

Replacement of Windows in Various Buildings Phase 3
Results
Conway, AR 72032

Lobby Window Renovation
Results
Stuttgart, AR

Door and Hardware
Alteration
Post-Bid
Pine Bluff, AR

Replacement of Ground Floor Windows
Results
Little Rock, AR

T-Hangar Door Repair Project Phase 2
Alteration
Post-Bid
Abbott, AR

Remove and Replace Windows at Central Fire Station
Alteration
Results
Hot Springs, AR 71901

Overhead Door Replacement
Term Contract
Post-Bid
Fayetteville, AR 72703

Replace Front and Rear Entry Doors and Replace Storage Room Doors at Sawyer Street Apartments
Alteration
Results
Blytheville, AR

Exterior Door Replacement at Three Sites Near Mena, AR and Window Replacement at One Site
Alteration
Post-Bid
Mena, AR

Purchase and Install of 15 Insulated, Fixed, Aluminum Frame Windows
Alteration
Results
Texarkana, AR 71854

Window, Security Window Screen and Interior Door Replacement
Alteration
Post-Bid
Arkadelphia, AR

Arkansas State Capitol Window Restoration - Phase 1
Alteration
Results
Little Rock, AR 72201

J049--Overhead Door Replacement
Alteration
Post-Bid
Fayetteville, AR 72703

Reported 04/05/2022 12:00 AM
Project Title

Remove and Replace Windows at Central Fire Station

Physical Address View project details and contacts
City, State (County) Hot Springs, AR 71901   (Garland County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $20,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide labor and materials to remove and replace various windows at Central Fire Station, 310 Broadway, Hot spring AR. To replace the existing hollow metal windows with new aluminum window frames and install new 1" glass as shown on the provided picture: 1. Remove upstairs existing and/or downstairs existing hollow metal window frame. 2. Provide and install new waterproof membrane as recommended by Cromwell Engineering report (see attachment). 3. Provide and install new aluminum store front window frames with new 1" glass. The frame's finish color needs to be Hartford Green. The color needs to match the newest replaced frames color (Hartford Green) in the conference room, tv room, and other areas that were completed in 2017. 4. Upstairs window frames and downstairs window frames will be 4 1/2” depth overall. 5. Provide and install new wood window trim upstairs and downstairs. 6. Patch and repair interior of walls around window frames as needed. 7. Patch and repair exterior of walls around window frames as needed. 8. Clean up after the operation. 9. Any unfinished open areas must be covered at the end of the day to prevent water leakage during a rain event.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents