Similar Projects
New Rockford-Sheyenne School Boiler Replacement
Alteration
Results
$452,000 est. value
New Rockford, ND 58356

Mechanical Upgrades Phase 2
Renovation
Results
Minot, Towner, ND 58788

Mechanical Upgrades Phase 2
Renovation
Results
Minot, Towner, ND 58788

Building Remodel Troop Medical Clinic Building 3500 - Mechanical
Post-Bid
Devils Lake, ND

NDSU - Ladd Hall - 005 - Roof Replacement and Miscellaneous Upgrades
Results
Fargo, ND 58102

Boiler Maintenance
Term Contract
Post-Bid
Minot Air Force Base, ND

Boiler Upgrade at Fire Station #1
Renovation
Results
Bismarck, ND 58501

Deaerator Replacement
Post-Bid
ND 58301

Grand Forks County Office Building and Courthouse Safety Improvements - Mechanical
Post-Bid
Grand Forks, ND 58201

International Peace Gardens - Campus Upgrades Bid Package #2 - Vitko Conservatory Expansion
New Construction, Demolition, Alteration
Post-Bid
Dunseith, Minot, ND

International Peace Gardens - Campus Upgrades Bid Package #2 - Vitko Conservatory Expansion
New Construction, Demolition, Alteration
Post-Bid
Dunseith, Minot, ND

Building Conversion 2340 Camp Grafton-Mechanical
Alteration
Post-Bid
Devils Lake, ND 58301

Early Childhood Center Interior Remodeling - Mechanical
Results
West Fargo, ND 58078

District Health Unit - Emergency Building Repairs
Alteration
Post-Bid
Minot, ND

Minto School Classroom and Office Expansion Project - Mechanical Construction
Alteration
Results
Minto, ND 58261

Last Updated 10/05/2021 03:40 PM
Project Title

County Office Building Chiller Replacement

Physical Address View project details and contacts
City, State (County) Grand Forks, ND 58201   (Grand Forks County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

• Removal of the existing 300T (wet weight 20,000#) chiller and replacement with a new 300T (nominal) (20,000# lifted weight) and related electrical power, electrical controls, and piping disconnections and reconnections. • Field modifications of the existing screen wall decorative steel to create lifting access for the chiller replacement, including preparation protection of existing EPDM roof, preparation to lift the screen wall, store and protect it on site, and subsequent reattachment and field painting. • Crane rental, staging and road closure for the duration of the lifting processes, including a lifting and work sequence submittal.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents