Similar Projects
Haulover Park - Boat Ramp and Parking Lot Project
Infrastructure
Bidding
$9,890,000 est. value
Miami Beach, FL 33154

Safe Route to Schools Locations Phase 23 FM 439896-1
Infrastructure
Bidding
$289,532 est. value
Florida City, Miami, FL 33034

VCA Improvements to Common Areas & Parking Spaces
Post-Bid
Hialeah, FL 33014

Re-Pave / Repair / Re-Stripe Parking Lot - MIAMI FL
Post-Bid
Miami, FL 33158

VCA/ADA Accessibility Improvement to Common Areas and Parking Spaces - 6830/6870 West 7th Avenue
Results
Hialeah, FL 33014

VCA/ADA Accessibility Improvements to Common Areas and Parking Spaces - 30 West 33rd / 35 West 32nd Street
Results
Hialeah, FL 33010

Safe Route to Schools Locations Phase 22 FM 439895-1
Post-Bid
Less than $171,530 est. value
Hialeah, Miami Gardens, Opa-locka, FL 33014

Safe Route to Schools Locations Phase 18 FM 438147-1
Results
Less than $510,425 est. value
Miami, FL

Safe Route to Schools Locations Phase 21 FM 439894-1
Post-Bid
Less than $382,771 est. value
Miami, FL 33144

Safe Route to Schools Locations Phase 19 FM 438165-1
Results
Less than $497,525 est. value
Miami Gardens, FL 33056

Citywide Sidewalk Repair Services
Term Contract
Post-Bid
Less than $200,000 est. value
North Miami, FL

Safe Route to Schools Locations Phase 20 FM 438163-1
Results
Less than $430,356 est. value
Miami, FL 33168

Emergency Response for Sidewalk Repairs
Infrastructure
Post-Bid
$1,048,223 est. value
FL

Sidewalk Improvements - Multiple Sites
Results
Less than $1,433,636 est. value
Miami, FL

Bicycle Lane Separator
Infrastructure
Post-Bid
$416,946 est. value
Miami, Miami Beach, FL 33134

Last Updated 10/22/2021 02:50 AM
Project Title

Fairway Drive and Montrose Road Crosswalk Improvement Project

Physical Address View project details and contacts
City, State (County) Miami Lakes, FL 33014   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $195,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of furnishing all labor, materials, machinery, tools, means of transportation, supplies, equipment, and services necessary for the construction of and improvement of crosswalks at Fairway Drive and Montrose Road. The Work includes, but is not limited to, installation of in ground lighting, rectangular rapid flashing beacon, electrical service connections and other appurtenances as may be necessary, signage, paving, milling, resurfacing, striping, asphalt patching, concrete sidewalks, curbs and gutters repairs, installation, and replacement.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents