Similar Projects
Sweetbriar Sewer Pump Station Upgrades
New Construction
Bidding
Stafford, VA

Moores Creek Pump Station (MCPS) Temporary Bypass Pumping and Slide Gate Inspection
New Construction
Bidding
Charlottesville, VA 22902

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Crozet Flow Equalization Tank and Pumping Station Upgrade
Post-Bid
Charlottesville, VA

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Johnson Creek Wastewater Pump Station
Results
$8,067,444 est. value
Chester, VA 23836

Airport Hollow Sewage Pump Station Improvements Project
Renovation
Bidding
$235,000 to $265,000 est. value
Norton, VA

Pump Station 23 Service Area Phase 8
Post-Bid
Norfolk, VA

Construction of Arts and Conference Center Pump Station 114
Results
$1,000,000 to $2,999,999 est. value
Virginia Beach, VA 23456

Kings Trail Pump Station 234 Replacement
Post-Bid
Virginia Beach, VA

Oak Forest Pump Station Abandonment Project
Results
$959,491 est. value
Charlottesville, VA 22900

Langley School Pump Station and Force Main
Post-Bid
$3,400,000 est. value
McLean, VA 22101

Rady Park Pump Station Replacement
Results
Warrenton, VA

Construction of Lake Front Village Pump Station 309 Replacement
Post-Bid
Virginia Beach, VA 23456

Burton Station Sanitary Sewer Pumping Station #370
Results
$130,000 est. value
Virginia Beach, VA 23456

Last Updated 08/11/2021 11:22 AM
Project Title

Lift Station 1-1 Valve Replacement

Physical Address View project details and contacts
City, State (County) VA   (James City County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace two pump discharge gate valves and the vertical column piping at LS 1-1. The valves are to be relocated down to the top of the discharge elbow immediately off of the pumps. The vertical pipe columns are to be raised up from the discharge valve to tie into the Header above. The horizontal section of discharge piping shall be supported while the work is ongoing.

Details

Lift and Pump Stations, New Construction.
Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents