Similar Projects
Chilton New Stadium and Elementary School Addition and Renovations
Addition, Demolition, New Construction, Build-out, Infrastructure - 45,414 SF
Post-Bid
$4,000,000 CJ est. value
Chilton, WI 53014

East Verona Avenue / Ice Arena
Addition, Demolition, Infrastructure - 39,990 SF
Pending Verification
$17,000,000 CJ est. value
Verona, WI 53593

Hobbs: Facility Lighting LED Replacement - 410-004 - City of Eau Claire
Renovation
Conception
$460,000 CJ est. value
Eau Claire, WI 54703

Hobbs: Ice Center Improvements - 410-006 - City of Eau Claire
Renovation, Infrastructure
Conception
$975,000 CJ est. value
Eau Claire, WI 54703

Roger Harring Stadium Elevator Replacement - General
Renovation
Results
$675,000 est. value
La Crosse, WI 54601

Restroom Remodeling In South Facility - 540 - City Of La Crosse
Build-out
Conception
$360,000 CJ est. value
La Crosse, WI 54601

Roof Replacement For South Hall A And Lobby - 643 - City Of La Crosse
Renovation
Conception
$700,000 CJ est. value
La Crosse, WI 54601

Wilson Ice Arena Dasher Boards
Renovation
Post-Bid
Milwaukee, WI 53221

The Opportunity Center
New Construction, Infrastructure - 300,000 SF
Pending Verification
$80,000,000 CJ est. value
Milwaukee, WI 53209

Soccer Stadium
New Construction, Infrastructure
Design
$9,000,000 CJ est. value
Milwaukee, WI 53233

Little Chute High School Mustang Multi-Purpose Turf Stadium
Renovation - 97,815 SF
Post-Bid
Little Chute, WI

KB Willet Ice Arena Building Additions and Recladding Goerke Park Recladding and Ticket Booth/Entryways
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$3,821,789 CJ est. value
Stevens Point, WI 54481

Womens Volleyball Team Room Construction
New Construction, Infrastructure - 583 SF
Construction
$148,800 CJ est. value
Oshkosh, WI 54901

Last Updated 01/05/2023 05:36 AM
Project Title

Horlick Field Locker Room Upgrades

Physical Address View project details and contacts
City, State (County) Racine, WI 53404   (Racine County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $232,785 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract includes locker replacement, new finish work including floors and walls, LED lighting upgrades, and associated plumbing work. Pre-Qualification: Yes Bidders must be prequalified by the Commissioner of Public Works. Deadline for submitting a prequalification application is five (5) days prior to the time of bid opening. Forms are available either by emailing Kendra Marquez at Kendra.Marquez@cityofracine.org or by downloading

Details

2,600 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents