Similar Projects
Last Updated | 03/08/2022 08:19 AM |
Project Title | Construction Inspection for SR 28-A62 |
Physical Address | View project details and contacts |
City, State (County) | PA (Allegheny County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering, Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Part 1 Ecms 92276: This Is a Partial Design Build Project. Design Activities Are Limited To: Traffic Control Plan, Bridge Structure, Highway Lighting And Ada Curb Rampsfor The Milling And Resurfacing, Concrete Pavement Preservation, Guiderail, Drainage, Its, Highway Lighting, Traffic Signals, Signing And Pavement Marking, Bridge Preservation And Other Miscellaneous Construction, All Within a Length Of 32,547.25 Linear Feet (6.2 Miles) As Indicated On The Approved Drawings For State Route 0028, Section a62 (Allegheny Valley Expressway), In Allegheny County, Harmar Township, Springdale Township, Frazer Township, And East Deer Township, Commonwealth Of Pennsylvania.This Project Being Situated As Follows:State Route 0028, Section a62, From a Point 1300 Feet North Of The Harmar Township Line At Segment 0250/0251 Offset 1800/1800 (Station 617+00.00) To The Creighton Interchange At Segment 0370/0371 Offset 0371/1402 (Station 953+89.00 Nb/Station 954+58.00 Sb). Anticipated Completion Date: October 15, 2024 |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |