Similar Projects
Project Silver
New Construction, Infrastructure
Conception
Douglasville, GA

Highway 5 Gas Station
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Douglasville, GA 30135

SR 8 From Carroll County Line to CS 1306 / Bright Star Road
Infrastructure
Design
$3,000,000 CJ est. value
Douglasville, GA 30135

Senior Living Development - Douglasville
New Construction, Infrastructure
Design
$36,965,600 CJ est. value
Douglasville, GA 30134

West Pines Maintenance Facility Renovation
Demolition, New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Douglasville, GA 30134

New Dog River Reservoir Intake and Pumping Station
Infrastructure, Renovation
Bidding
$600,000 CJ est. value
Douglasville, GA 30134

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Douglasville-Douglas County Water & Sewer Authority Administrative Building Addition/Renovation - BUDGET ONLY
Addition, Demolition, Infrastructure, Renovation - 16,000 SF
Post-Bid
$3,850,000 CJ est. value
Douglasville, GA 30134

Lee Road Stormwater Improvements
Results
$138,000 est. value
Lithia Springs, GA 30122

2021 2 - Inch Water Line Replacement Project
Alteration
Results
$230,000 est. value
Douglasville, GA 30134

Cobb Tunnel Sewer Connection
Renovation, Infrastructure
Construction
$6,407,915 CJ est. value
Douglasville, GA 30134

Cobb Tunnel Sewer Connection
Renovation, Infrastructure
Construction
$6,407,915 CJ est. value
Douglasville, GA 30134

Oakmont Skyview Drive Warehouse
New Construction, Infrastructure - 181,430 SF
Pending Verification
$20,000,000 CJ est. value
Lithia Springs, GA 30122

Highway 92 Multi-Residential Development
New Construction, Infrastructure - 7,000 SF
Pending Verification
$10,000,000 CJ est. value
Douglasville, GA 30135

Thornton Road Warehouse
New Construction, Infrastructure
Conception
$10,500,000 CJ est. value
Lithia Springs, GA 30122

Last Updated 11/10/2022 10:03 AM
Project Title

2022 Sewer Manhole Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Douglasville, GA 30134   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $252,350 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 10, 2022. The project has not yet awarded. 2022 Sewer Manhole Rehabilitation Project. Sewer Manhole Rehabilitation Project for Douglasville - Douglas County Water and Sewer Authority 8763 Hospital Drive Douglasville, Georgia 30134 October 5, 2022 IFB # 267 The Douglasville - Douglas County Water and Sewer Authority (the "Authority") is soliciting competitive sealed bids from qualified contractors for the performance of the 2022 Sewer Manhole Rehabilitation Project (the "Project"), as more fully described in the Invitation for Bids. The scope of work includes the provision by the Contractor of all labor, materials, equipment, tools, transportation, and supplies necessary to complete the work. The Project will be "turn key" and require minimal involvement of Authority personnel. The work to be performed shall include repairing all voids, eliminating all infiltration, restoring the manholes to their original thickness, and providing corrosion protection of the manholes through application of a corrosion resistant liner. All work will be performed within Authority easements and/or inside public right of way. All anticipated rights of way and easements required for the Project have been obtained. All anticipated federal, state, and local permits required for the Project have been obtained. Parties interested in this Invitation for Bids must obtain a copy of the full bid package or their bids will be considered nonresponsive. To receive consideration, questions shall be submitted by e-mail to the Senior Procurement Specialist, Joseph Morency, at jmorency@ddcwsa.com, by the close of business at least seven (7) days before the advertised date for receipt of bids.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents