Last Updated | 12/13/2022 12:37 PM |
Project Title | RFP D/B - Purrysburg WTP Expansion to 30 MGD - Phase II |
Physical Address | View project details and contacts |
City, State (County) | Hardeeville, SC 29927 (Jasper County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $42,810,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Beaufort Jasper Water and Sewer Authority (BJWSA) owns and operates the Purrysburg WTP (PWTP), currently rated for 15 MGD, that supplies potable water to southern Beaufort and Jasper Counties. The PWTP was constructed in 2004 and designed to accommodate 2 additional 15 MGD expansions. Due to the continued rapid growth in the service area, PWTP is in need of the 1st planned 15 MGD expansion. Therefore, BJWSA is seeking qualified contractors interested in the design-bid-build expansion project which consists of the following: modifications to the river, reservoir, transfer, and high service pump stations; chemical feed facility improvements; weir flow splitting facility; PAC contactor; static rapid mix equipment; flocculation and sedimentation basins; dual media filters; plant support facilities; miscellaneous valves and piping; instrumentation and controls; electrical work; and civil/site work to include clearing and grubbing. Performing all of the Purrysburg WTP Expansion to 30 MGD - Phase II work including, but not limited to, River Pump Station Upgrades, Reservoir Pump Station Upgrades, Transfer Pump Station Upgrades, High Service Pump Station Upgrades, PAC Contactor Construction, PAC Silo Construction, Flocculation Construction, Sedimentation Basin Construction, Filtration Construction, Administration Modifications, and Chemical Feed Modification Sodium Hypochlorite Area Polyurethane Leak Stop Injection instrumentation and SCADA integration associated with Phase II Clearing and grubbing, civil/site work, etc. Installation of new pumps in River, Reservoir, Transfer, and High-Pressure Pump Stations. Upgrading Chemical Feed Facility (addition of tanks, pumps, sodium hypochlorite onsite generation equipment, and PAC Storage & Feed silo) Construction of weir flow splitting facility Construction of PAC contactor Installation of Static Rapid mix equipment Construction of new Flocculation and Sedimentation Basin Construction of 5 new Dual Media Filters Construction of additional Plant Support Facilities Miscellaneous valves and piping. Instrumentation and Controls Electrical work and controls. Deadline to submit Questions Nov 8th 2022, 5:00 PM EST Work substantially complete the project within 821 consecutive calendar days and to fully complete the project within 913 consecutive calendar days |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |