Similar Projects
A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

Indefinite Delivery Indefinite Quantity Architectural Engineering Contracts
New Construction
Bidding
Denver, CO - Atlanta, GA - Boston, MA - Philadelphia, PA 80225

Indefinite Delivery Indefinite Quantity Architectural Engineering Contracts
New Construction
Bidding
Denver, CO - Atlanta, GA - Boston, MA - Philadelphia, PA 80225

Unrestricted A-E Environmental IDIQ MATOC for A-E Environmental Support Services
Post-Bid
$10,000 to $49,000,000 est. value

Unrestricted A-E Environmental IDIQ MATOC for A-E Environmental Support Services
Post-Bid
$10,000 to $49,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Addiction Treatment Center RFP
Build-Out
Bidding
IL

IQ AE Services - Multiple Areas
Post-Bid
$10,000 to $10,000,000 est. value
Washington, DC 20260

USDA Forest Service Eastern Region Architect & Engineer Services IDIQ
Results
$2,500 to $5,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Bidding
Less than $30,000,000 est. value

Architect/Engineer Services for Survey and Mapping Projects Primarily Within The Great Lakes and Ohio River Division Mission Boundaries
Post-Bid
$35,000 to $2,000,000 est. value

Reported 10/20/2021 11:36 AM
Project Title

A/E Services For Replace Chiller in The Forensic Treatment Complex

Physical Address View project details and contacts
City, State (County) Elgin, IL 60123   (Kane County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Contract Award
Bids Due View project details and contacts
Estimated Value $1,631,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Elgin Mental Health Center is a 33-building facility and the Forensic Treatment Complex (BR121) is a 140,000 SF, 2-story building. The scope of work provides for replacing an existing steam absorption chiller with an electric centrifugal chiller, as well as the associated cooling tower, pumps, controls, electrical feeds, clean and refill the existing chilled water loop with a propylene glycol solution and any other related work required to bring the system into compliance with current applicable standards. The A/E will provide load calculations, energy analysis, reviews of existing system configuration, connected equipment and load and provide recommendations and design of various upgrades to provide redundant and reliable cooling for this essential facility. Temporary cooling may be required if the work cannot be completed before the 2021 cooling season. The A/E will need to determine if any components of this project are eligible for a utility company or other energy grant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents